Laserfiche WebLink
Review File:Homestead Road <br /> Preliminary Plat Exhibits <br /> Engineering Review <br /> March 29, 2017 <br /> Page 3 of 3 <br /> Preliminary Plat Utility Plan Sheet S3: <br /> 1. See note for sheet S2. <br /> 2. The dashed line indicating possible future right-of-way must be changed as noted above. <br /> 3. Turn off the dimensions on the utility sheet. <br /> 4. Add City details STR25 and STR 26 to the plan set. The details are available on the City <br /> website. <br /> 5. Add the following notes to the final utility plan regarding abandoning the existing services. <br /> 1. The work shall be inspected by the City. <br /> 2. The contractor must provide a detour plan to the City for approval prior to commencing <br /> work. <br /> 3. Pavement shall be sawcut per detail STR25, with the wear course milled to offset the <br /> vertical joints prior to paving. <br /> 4. The excavation must be backfilled at the end of the day, restored with Class 5 and open to <br /> traffic. <br /> Tree Survey Report: <br /> 1. The tree survey information must be included as a sheet in the plans showing the location <br /> of trees to protect or remove in the area of the proposed homes. The viewport should match <br /> the grading and utility plan for showing the trees to be removed. <br />