My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:02 PM
Creation date
4/25/2017 2:48:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> x. <br /> 'r <br /> F{ MISSISSIPPI WEST REGIONAL PARI{MASTER PLAN <br /> Concep SMI Design <br /> t117i <br /> FIGURE 3 <br /> Wayfinding within the park includes several different types of signs. A monument <br /> entrance sign will be located near the vehicular entrance to the park, as illustrated in <br /> Figure 10. Vehicular scaled directional signs will be placed along roadways for visitors <br /> to quickly find their way within the park. Trailhead signs and directional signs are <br /> placed at trailheads to provide an overview of the parks and help users orient <br /> themselves to the park. An example of a trailhead sign is shown in Figure 11. <br /> Directional and map signs will also be located at decision-making points along the <br /> trails. The estimated cost for signs throughout the park is approximately $50,000. <br /> 1 7714, <br /> ry <br /> FIGURE 10 <br /> FIGURE 11 <br /> 3/6/2017 Mississippi West Regional Park Master Plan Amendment 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.