My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:02 PM
Creation date
4/25/2017 2:48:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development would occur in phases. The first phase of development is the design, <br /> engineering and construction of a temporary road, boat/canoe launch and fishing pier <br /> providing access to the river. <br /> F` <br /> x J <br /> w <br /> i� <br /> r r J <br /> r[ T f <br /> x <br /> ALI f <br /> spp <br /> Phase 1 Development at Mississippi West Regional Park <br /> Phase 1: Boat Launch Development Estimate <br /> Total Cost <br /> Item 2010 <br /> Design/Engineering (in-kind) $ - <br /> Boat Launch Road/Parking Lot $ 190,000 <br /> Boat Launch $ 40,000 <br /> Temporary Access Road $ 50,000 <br /> Fishing Pier $ 40,000 <br /> Signs $ 5,000 <br /> Topographic Survey/Construction Staking $ 10,000 <br /> Removal/Demolition of House and Hazard Material Abatement $ 40,000 <br /> Permits (City, Watershed, DNR, COE, NPS) $ 5,000 <br /> Subtotal $ 380,000 <br /> Contingency and Fees $ 20,000 <br /> Total $ 400,000 <br /> Page 13 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.