Laserfiche WebLink
After the infrastructure is in place, the next phase of development would include the <br /> construction of a few new facilities, such as three picnic shelters, one to two restroom <br /> buildings, a gatehouse, additional trails, a play structure, utilities, lighting and site <br /> furnishings as well as some additional natural resource restoration. <br /> OPEN <br /> PLAY <br /> a_ <br /> '� l � �� <br /> �.,C_. <br /> I <br /> Phase 3 Development at Mississippi West Regional Park <br /> Phase 3: Park Facility Development Estimate <br /> Total Cost <br /> Item (2010) <br /> Design -Architectural & Engineering Services $ 120,000 <br /> Picnic Shelters 3 $ 600,000 <br /> Restroom Building (2) $ 200,000 <br /> Entrance Gate/POC station $ 100,000 <br /> Connector Trails $ 150,000 <br /> Play Structure $ 100,000 <br /> Utilities $ 50,000 <br /> Natural Resource Restoration $ 25,000 <br /> Lighting, Signage and Site Furnishings $ 25,000 <br /> Geotechnical Survey/Wetland Delineation and Assessment $ 25,000 <br /> Survey/Construction Staking $ 25,000 <br /> Permits (City, Watershed, DNR, COE, NPS) $ 10,000 <br /> Subtotal $ 1,430,000 <br /> Fees and Contingency $ 140,000 <br /> Total $ 1,570,000 <br /> Page 15 of 22 <br />