My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 04/25/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:02 PM
Creation date
4/25/2017 2:48:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
838
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. The Park impact, proposed mitigation, and a proposed Section 4(f) de minimis finding will be <br /> reported in the Environmental Assessment (EA) that is being prepared for the Project. This <br /> EA will be published and a public hearing held to provide the opportunity for public <br /> comment on the features, activities and attributes of the Park. The final determination of <br /> Section 4(f) de minimis applicability will be made by FHWA following a review of any <br /> public comments received. <br /> 8. This Memorandum of Understanding will be re-evaluated and amended, if required, upon <br /> any of the following conditions: <br /> a. Proposal by any of the Signatory Agencies to implement specific Section 4(f) impact <br /> mitigation measures; and, as specific mitigation is defined, documenting the terms of <br /> agreement between M VDOT and the County of Anoka regarding the proportion of <br /> mitigation costs to be paid by each agency. <br /> b. Re-evaluation of the Project under NEPA. <br /> c. Request by any of the Signatory Agencies. <br /> -3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.