PAY ESTIMATE NO. 4 ENGINEER
<br />SUNWOOD DRIVE N.W, AND RHINESTONE STREET NW
<br />
<br />Bid Schedule "W' - Rumsey Local lqmding Snuwood Drive NW Continued
<br />
<br />ITEM CONTRACT USED TO-
<br /> ITEM QTY UNIT UNIT COST EXTENSION
<br />NO. AMOUNT DATE
<br />155 CONSTP, IJCT DRAINAGE STRIJCTURE DESIGN 48 - 4020 34 LF $144.02 $4,896.68 $0.00
<br />156 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 6 LF $186.50 $1,119.00 $0.00
<br />157 CASTING ASSEMBLIES g-17 15 EACH $564.45 $8,466.75 15 $8,46{3.75
<br />158 CONSTRUCT DRAINAGE STRUCTURE DES1GN N-4003 5 EACH . $318.59 $l,592.95 $0.00
<br />159 CONSTRUCT SANITARY MANHOLE- 48 (0-8') 15 EACH $2,056.12 $30,841.80 12 $24,673.44
<br />160 CONSTRUCT SANITARY MANllOLE- 54 (0-8') 5 EACH $2,618.03 $13,090.15 4 -$10,472.12
<br />161 CONSTRUCT SAN1T,,\F,Y MANHOLE - 60 (0-8') 4 EACH $2,745.83 $10,983.32 4 $10,983.32
<br />162 EXTRA DEPTH MANHOLE (OVER 8") 48 100 LF $85.20 $8,520.00 57 $4,856.40
<br />
<br /> 163 EXTRA DEPTH MANHOI,E (OVER 8") 54 30 LF $133.13 $3,993.90 20 $2,662.60
<br />
<br /> 164 EX'FICA DEPTH MANHOLE (OVER 8") 60 22 LF $149.10 $3,280.20 [6.4 $2,445.24
<br /> 165 4" CONCRETE WALK 5600 SI: $2.01 $11,256.00 $0.00
<br /> 166 CONCRETE CURB AND GUTTER DESIGN B424 5475 LF $8.94 $48,946.50 5367 $47,980.98
<br /> 167 SIGN PANELS TYPE C 37.5 SF $22.19 $832.13 $0.00
<br /> 168 TYPE I11 BARI*,II)ADE 8 EACH $309.60 $2,476.80 $0.00
<br /> 169 PAVEMENT IvlESSAGE (RIGI IT ARROW) POLY PREFORMED 3 EACH $309.60 $928.80 $0.00
<br /> 170 PAVEMENT MESSAGE (LEFT AP-,~,.OW) POLY PREFORMED 3 EACH $309.60 $928.80 $0.00
<br /> 171 PA VEMENT IMESSAGE (ONLY) POLY PREFORMED 2 EACH $387.00 $774.00 $0.00
<br /> 172 4" SOLID LINE WI[ITL - EPOXY 6500 LF $0.50 $3,250.00 $0.00
<br /> 173 4" BROKEN LINE W[IITE- EPOXY 150 LF $0.50 $75.00 $0.00
<br /> [74 4" DOUBLE S()LII) I,INE YELLOW- EPOXY 1350 LF $1.01 $1,363.50 $0.00
<br /> 175 24" SOLID LINE YELl,OW - EPOXY 500 LF $5.68 $2,840.00 $0.00
<br /> 176 SELl)lNG 1.0 ACRE $258.00 $258.00 $0.00
<br /> 177 SODI)ING, TYPE I,AWN 1250 SY $2.48 $3,100.00 $0.00
<br /> 178 SEED MIXTURE 260 100 LB $2.63 $263.00 $0.00
<br /> 179 MULC[[ MATERIAL TYPE'3 2 TON $154.80 $309.60 $0.00
<br /> 180 EROSION CONTROL BLANKETS CATEGORY 3 200 SY $1.55 $310.00 $0.00
<br /> 181 COMMERCIAL FERTILIZER ANALYSIS 24-2-24 400 LBS $0.36 $144.0C $0.00
<br />
<br />Total Bid Schedule "I1'' $1,631,033.54 $1,231,618,70
<br />
<br />G.ISharedDoc,slMunlcipal/ARamsey/
<br />3171/ra3171pe xlsPAY ESTIMATE NO. 4 PE-6 Rev. 4/14/04