Laserfiche WebLink
CASE # Z <br /> <br />PUBLIC HEARING AND LEVY OF SPECIAL ASSESSMENTS <br />FOR THE 2004 STREET MAINTENANCE PROGRAM <br /> By: Steven J Jankowski, City Engineer <br /> <br />Background: <br /> <br />The 2004 Street Maintenance Program consists of fourteen individual projects covering <br />20.89 miles of street. Twelve of these projects consist of crackfilling followed by <br />sealcoating of the roadway. Two projects consist of providing a one and one half inch <br />bituminous overlay of the existing pavement. All projects have been substantially <br />completed and the final costs have been determined. It is City policy to assess 50% of <br />the project cost to the benefited property owners, while the remaining half is financed <br />through City general funds. Below is a summary of the assessments proposed on each <br />project along with a comparison to the costs estimated in the project feasibility study in <br />January of 2004: <br /> <br />Project <br /> <br />Crackfill/ <br />Sealcoat <br /> <br />04-02 <br /> <br />04-03 <br /> <br />04-04 <br /> <br />04-05 <br /> <br />04-06 <br />04-07 <br /> <br />Description <br /> <br />Sec 11 - Misc Plats <br />Sec 10 & 11 -Menkveld's Unplatted <br /> <br />Menkveld's Country Park <br />Oakwood Hills <br />Rolling Green <br />Sec 1 - Waco St & Waco Dr <br /> <br />Hall Dover <br />Hunters Ridge <br /> <br />Rodeo Hills <br />Sec 1 - Unplatted S/O CR 27 <br />Autumn Heights <br /> <br />Windsorwood <br /> <br />Autumn Meadows <br />Oak Run <br /> <br />Feasibility Study <br />Unit Assessment <br /> <br /> Final <br />Unit Assessment <br /> <br />$110.93 $99.69 <br /> <br />$132.42 $135.33 <br /> <br />$160.95 $140.34 <br /> <br />$173.68 $132.72 <br /> <br />$214.71 $158.34 <br />$208.68 $173.31 <br /> <br />04-08 Bison St- 173rdAve/CDS $233.95 $228.66 <br /> <br /> <br />