My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/09/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 05/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:24 PM
Creation date
5/12/2017 3:18:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Woodlands 4th Addition <br />Final Plat <br />Engineering Review <br />May 4, 2017 <br />Page 3 of 3 <br />Infiltration volume 5,554 cubic feet <br />required <br />Subcut for sand liner 1 foot <br />Total Excavation 8331 Cubic feet or 309 CY <br />Grading Unit Cost $15/ Cubic Yard <br />Grading Cost <br />Liner Volume 103 Cubic Yard <br />Liner Unit Cost $30/ Cubic Yard <br />Liner Cost <br />Seeding Cost <br />Subtotal <br />Total With 15% Contingency <br />$ 4,630 <br />$ 3,090 <br />$ 400 <br />$ 8,150 <br />$ 9.370 <br />The stormwater summary included P8 model data showing the site provides the necessary Total <br />Suspended Solids and Total Phosphorus removals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.