My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/09/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 05/09/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:32:24 PM
Creation date
5/12/2017 3:18:12 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/09/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 1 — Arced Area SW Corner of Schmitz's Potassium Property Extending into Shade Tree <br />Communities, LLC Property Located Adjacent to the West <br />• Per drawings provided by City <br />o Area to be a radius from the SW lot corner of the Schmitz's <br />o Extending due East to eastern edge of current improved surface drive area <br />o Arcing from this point to the northwest until intersecting with the western <br />boundary of the Schmitz's property due north of the SW corner of the property <br />• Move electrical pole to accommodate the new area <br />o Approximately $2,500 for pole relocation <br />■ Schmitz's responsible for additional charges for underground connection <br />to new pole location <br />• Lower raised area property to current improved surface drive area elevation <br />• Install appropriate drainage angle to maintain current runoff directions <br />• Install appropriate Class V to accommodate customary vehicle traffic for this local <br />• Develop permanent solution on adjoining property to west within 36 months and vacate <br />arced area at that time <br />• Approximate total cost of $18-23K <br />• Approximately $10K of this estimate is for Class V and excessive excavation fees <br />o This should be able to be pulled from City reserves and excavation costs reduced <br />from $3,600 to approximately $1,600 <br />• City's contribution to be $5-8K <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.