Laserfiche WebLink
Agreement for Professional Services <br />This Agreement made on the 21th day of October, 2016, between City of Ramsey (hereinafter "City") and Short <br />Elliott Hendrickson Inc. (hereinafter "Consultant"). <br />This Agreement authorizes and describes the scope, schedule, and payment conditions for Consultant's work on <br />the Project titled Well House 3 Standby Generator Design, generally described as the engineering design and <br />support for the addition of a permanently installed standby generator to Well House No. 3. The project is divided <br />into three phases for the Design, Quotation, and Construction of this work. <br />Scope: The Basic Services to be provided by Consultant as set forth herein is provided subject to the attached <br />General Conditions of the Agreement for Professional Services (General Conditions Rev. 07.14.16), which is <br />incorporated by reference herein and subject to Exhibits attached to this Agreement. <br />Phase 1 — Design Phase <br />• Complete generator sizing calculation for standby natural gas generator. Contact vendors to verify sizing, <br />cost of unit and preliminary foot print. <br />• Prepare construction documents for new standby generator consisting of drawings and electrical <br />specifications <br />• Prepare opinion of probable cost for the installation of the standby generator. <br />Phase 2 — Quotation Phase <br />• Assist the City in obtaining quotations from a minimum of three (3) qualified contractors <br />• Respond to questions from prospective contractors <br />• Issue necessary addenda to Project Construction Documents <br />• Review submitted quotes and provide recommendations to the City <br />• Assist the City in the award of the Project <br />Phase 3 — Construction Phase <br />• Set-up and attend a pre -construction meeting <br />• Provide review of Shop Drawings <br />• Respond to RFIs submitted <br />• Review Contractor's Applications for Payment <br />• Review of Operation & Maintenance Manuals <br />• Attend generator test <br />• Prepare a Punch List <br />• Perform final inspection <br />Services Provided by the City: The City shall provide the Consultant with the following services: <br />• Provide drawings of the existing facilities <br />Schedule: The anticipated schedule for the completion of work described in the scope is described below: <br />Action Item <br />Scheduled Date <br />Commence Design <br />Prepare construction documents and Opinion of Probable Cost <br />Receive quotations from contractor <br />Award contract <br />Construction: <br />Project Close -Out <br />Upon approval of proposal <br />Within five weeks of approval of proposal <br />Within nine weeks of approval of proposal <br />Within twelve weeks of approval of proposal <br />Within five months of award of contract <br />Compensation for Services: The fees for each phase have been determined and are described below: <br />Phase 1 Engineering Fees: The Consultant shall complete Phase 1 — Design efforts on an hourly basis for a Not - <br />to -Exceed Fee of $8,800, which includes reimbursable expenses. <br />Short Elliott Hendrickson Inc. <br />(Rev. 07.14.16) <br />Letter Agreement - 1 City of Ramsey <br />