Laserfiche WebLink
2. INTRODUCTION <br />2.1 Authorization <br />The preparation of this report was authorized by the Ramsey City Council on January l Oth, <br />2017. This project has been designated as City Improvement Project No. 17-02. <br />2.2 Program Overview <br />In support of the City's long-term Street Maintenance Program, the existing bituminous <br />pavement section is proposed to be reconstructed, damaged concrete curb and gutter sections will <br />be removed and replaced, and other appurtenant work will be completed as outlined in this <br />report. <br />The City's pavement evaluation process involves a visual evaluation of each street's pavement <br />surface based on the type, extent and severity of each pavement distress observed. Numerous <br />types of pavement distresses may exist within a pavement section including, but not limited to, <br />alligator cracking, block cracking, longitudinal cracking, transverse cracking, rutting, raveling, <br />shoving, potholes and patches. This field data is then used to rate the pavement condition. <br />The City uses the Pavement and Surface Evaluation Rating (PASER) system to rate pavement <br />condition. A PASER rating is a numerical index between 1 and 10 indicating the condition of a <br />pavement based on the various pavement distresses recorded during visual observations. A <br />PASER rating of 10 represents brand new pavement, while a PASER rating of 1 represents a <br />pavement section that has fallen into complete disrepair requiring full street reconstructions. <br />In the fall of 2016, these street segments in the Rivers Bend neighborhood were rated with <br />PASER ratings of 3. <br />2.3 Scope <br />City of Ramsey Improvement Project 17-02 proposes to reconstruct the existing bituminous <br />pavement, to remove and replace damaged concrete curb and gutter sections, and to complete <br />other appurtenant work on four street segments within the Rivers Bend residential neighborhood <br />including 147th Lane between Xkimo Street and Waco Street, 148th Avenue between Yakima <br />Street and Xkimo Street, Xkimo Street between 147th Lane and 149th Avenue, and Yakima <br />Street between 148th Avenue and 149th Avenue. These street segments total approximately <br />2,774 linear feet (0.53 miles) in length. <br />The existing bituminous pavement is proposed to be reconstructed by removing the existing <br />pavement and disposing of it off -site. The existing class 5 aggregate base would then be <br />reshaped and compacted, and then 3.5 inches of new bituminous pavement would be placed on <br />top. This would result in a 7-ton pavement design per the City's typical residential street design. <br />A map showing the location and scope of the proposed improvements is included as Figure 1 in <br />Appendix A. <br />Feasibility Report <br />Rivers Bend Street Reconstructions <br />City of Ramsey Project No. 17-02 <br />Page 3 <br />