Laserfiche WebLink
4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, power and cable utilities regarding this project. <br />During preparation of plans and specifications, staff will meet with the private utility companies <br />to discuss the proposed improvements as noted in the project schedule within this report. The <br />alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipated with this project. <br />Should any utility company indicate they wish to upgrade, replace and/or otherwise modify their <br />services during this project, any such upgrades, replacements and/or modifications will be at the <br />sole discretion and cost of the utility company. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />■ MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />A stormwater permit from the Lower Rum River Watershed Management Organization will not <br />be required with this project. <br />4.8 Right-of-Ways/Easements <br />It is anticipated that all improvements will occur within existing City right-of-ways and/or <br />easements, with the possible exception of tying into private driveways and yards. It is therefore <br />not anticipated that the City will need to acquire additional permanent right-of-way or easements <br />for this project. As such, costs for right-of-way or easement acquisitions are not included in the <br />probable project costs. <br />City staff will obtain any required right of entries. <br />Feasibility Report <br />Rivers Bend Street Reconstructions <br />City of Ramsey Project No. 17-02 <br />Page 8 <br />