My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/21/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 03/21/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:52:18 AM
Creation date
5/23/2017 9:28:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOIVIIVIENDATIONS <br />City of Ramsey Improvement Project 17-02 proposes to reconstruct the bituminous pavement <br />section, to remove and replace damaged concrete curb and gutter, and to complete miscellaneous <br />appurtenant work on four street segments within the Rivers Bend residential neighborhood <br />including 147th Lane between Xkimo Street and Waco Street, 148th Avenue between Yakima <br />Street and Xkimo Street, Xkimo Street between 147th Lane and 149th Avenue, and Yakima <br />Street between 148th Avenue and 149th Avenue. These street segments measure approximately <br />2,774 linear feet (0.53 miles). <br />It is the recommendation of City staff that City Project No. 17-02 is feasible, necessary, and cost- <br />effective from an engineering standpoint. However, it would be most cost-effective to construct <br />this project in conjunction with the Stanhope Terrace Street Reconstructions project, which is <br />currently scheduled for construction in 2018. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Staff recommends reconstructing the four street segments within the Rivers Bend <br />residential neighborhood including 147th Lane between Xkimo Street and Waco Street, <br />148th Avenue between Yakima Street and Xkimo Street, Xkimo Street between 147th <br />Lane and 149th Avenue, and Yakima Street between 148th Avenue and 149th Avenue in <br />conjunction with the Stanhope Terrace Street Reconstructions project in 2018. <br />2. Staff recommends ordering an assessment appraisal consultation report to ensure that the <br />preliminary special assessments proposed herein will not exceed the benefit received as a <br />result of the improvements in accordance with the City's Special Assessments Policy. <br />3. Staff recommends excluding private irrigation system work from this project, and from <br />all future City Improvement Projects, and instead recommends notifying property owners <br />of pending construction as far in advance as possible and instructing them to relocate the <br />irrigation system(s) away from the construction area during construction, then allow <br />replacement in or near the original location after construction is complete. <br />4. Staff recommends meeting with all owners of assessable properties to inform them of the <br />proposed improvements, the proposed use of special assessments, and to gather their <br />input prior to conducting the Public Hearing and requesting Council authorization to <br />prepare plans and specifications on July 1 lth. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Accept the preliminary residential special assessment rates proposed herein. <br />2. Adopt Resolution #17-01-028 accepting this Feasibility Report. <br />Feasibility Report <br />Rivers Bend Street Reconstructions <br />City of Ramsey Project No. 17-02 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.