My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 04/18/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:52:35 AM
Creation date
5/23/2017 9:39:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Costs and Quantities <br />Revise Signal System (FYAModifications) <br />{}SAH83at8unvvoodDhve/147thAvenue NVV <br />Prepared byJPWG(SEH)onMarch 21.2U17 <br />Item <br />Quantity Unit Cost Total Cost <br />Estimated Estimated Estimated <br />Remove 3'8ocUonSignals 8 $300 $2,400 <br />4-SecUonSignals (with LED) 0 $QOD $8'100 <br />5-Foot Extension 1 $2.500 $2.500 <br />Strap -on Mid Mast Arm Mount 1 $1.000 $1'000 <br />R1U-X12Sign Panels 4 $500 02'000 <br />Controller Cabinet Modifications 1 $2.000 $2.000 <br />Gx6NK8CLoop Detectors 8 $1.500 $12'000 <br />6/c#14 Cable (to poles 1 2, 3, 4) 800' $2 $1.000 <br />EVPdetector modifications 1 $500 3500 <br />Traffic Control 1 $2,500 $2.500 <br />Sub Total $34'600 <br />Miscellaneous approx. 15% $5,400 <br />Total Estimated Revise Signal System Costs $40'00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.