Laserfiche WebLink
section <br />. Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />. This project is currently unscheduled and unfunded <br />MnDOT Improvement Projects <br />• Trunk Highway 10 Cable Median Barrier Installation (2018) <br />• Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017) <br />• Preliminary design underway <br />Items of Interest <br />• Updating Wellhead Protection Plan <br />• Request for Quotes for Ground Penetrating Radar, Pavement Corings and Soil Borings on Street <br />Maintenance Projects in 2018 & 2019 CIP <br />Timeframe: <br />Staff estimates that 5 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />Action: <br />No action required. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 04/12/2017 01:39 PM <br />Kurt Ulrich Kurt Ulrich 04/13/2017 04:02 PM <br />Form Started By: Bruce Westby Started On: 04/11/2017 08:00 AM <br />Final Approval Date: 04/13/2017 <br />