Laserfiche WebLink
Public Works Committee 5. 4. <br />Meeting Date: 04/18/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommending City Council Approval of Plans and Specifications for Improvement Project # 17-00, <br />Sunwood Drive Reconstruction <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider recommending City Council approval of plans and specifications for <br />Improvement Project #17-00, Sunwood Drive Reconstruction. <br />Background: <br />Attached are current plans for Improvement Project #17-00, Sunwood Drive Reconstruction. These plans are being <br />reviewed by MnDOT State Aid. Approval by State Aid must be received before the City can bid the project. Staff <br />anticipates receiving State Aid approval prior to requesting City Council approval of plans and specifications and <br />authorization to bid the project on May 9th. This schedule would allow construction to begin in late June and to be <br />substantially complete by September 1st. <br />The design represented in the attached plans is generally consistent with the design as discussed with the City <br />Council and addressed within the Feasibility Report. The only significant difference is that instead of milling 3+ <br />inches off the top of the existing pavement and hauling it off site, all of the existing bituminous pavement will be <br />reclaimed and mixed with the existing aggregate base, then 4 inches of the reclaim material will be hauled off site <br />to allow for 4 inches of new bituminous pavement to maintain existing elevations. The project also proposes to <br />install 6 inches of stabilized reclamation material now instead of 5 inches as proposed in the Feasibility Report, <br />thereby providing a stronger pavement section. <br />The Feasibility Report identified estimated costs in the amount of $607,000. The current estimated project costs per <br />the attached plans are $571,539.48. Special assessments are proposed to pay for 25% of the total project costs. <br />Timeframe: <br />Staff estimates 10 minutes will be required to present this case and respond to questions. <br />Observations/Alternatives: <br />Observations: <br />Staff is working with property owners to ensure they are fully aware of the current plans and tentative schedule to <br />reconstruct their driveway accesses. <br />Alternatives: <br />Alternative # 1 — Motion recommending City Council approval of plans and specifications for Improvement Project <br />#17-00, Sunwood Drive Reconstruction. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Staff proposes to fund the proposed improvements using a combination of special assessments, street <br />reconstruction bond funds, and stormwater utility funds. <br />