Laserfiche WebLink
Public Works Committee 6. 2. <br />Meeting Date: 05/16/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Review Preliminary Plans for Improvement Project #17-04, Sunwood Drive Striping Improvements. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to review preliminay plans for Improvement Project #17-04, Sunwood Drive Striping <br />Improvements. <br />Background: <br />The existing striping along Sunwood Drive between Armstrong Boulevard and Ramsey Boulevard is missing or <br />faded in many areas, and some areas are no longer striped appropriately based on recent development that occurred <br />since the street was originally striped. Staff is therefore in the process of preparing preliminary plans for <br />Improvement Project #17-04, Sunwood Drive Striping Improvements, and will present the plans to the Public <br />Works Committee at the meeting. <br />In summary, the preliminary plans represent a design that replaces all existing Center Two -Way Turn Lanes with <br />dedicated left turn lanes, which will result in less driver confusion. The plans also include a dedicated left turn lane <br />for westbound vehicles to use when turning into Casey's , as well as a dedicated left turn lane for westbound <br />vehicles turning into the Residence at the COR. <br />At the time this case was prepared, Staff was still developing preliminary plans. Preliminary plans will therefore be <br />presented to the Public Works Committee during the meeting. <br />Timeframe: <br />Staff estimates 10 minutes will be required to present this case and respond to questions. <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />Preliminary estimated costs will be presented during the meeting, along with the preliminary plans. <br />Recommendation: <br />N/A <br />Action: <br />N/A <br />No file(s) attached. <br />Attachments <br />Form Review <br />