My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/16/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 05/16/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:07:49 AM
Creation date
5/23/2017 9:41:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/16/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 3. <br />Meeting Date: 05/16/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Business Park 95 Regional Stormwater Pond Improvements <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />• Andrie Street & 164th Lane Reconstruction <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />• Mississippi River Trail Phase 3 <br />• Work is substantially complete <br />• Final completion scheduled for summer 2017 <br />• Zeolite Street Storm Sewer Extension Improvements <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />• Riverdale Drive Extension - Traprock St. to Ramsey Blvd. <br />• Plans and specifications are complete <br />• Working with Anoka County Parks to acquire 5.3 acres of roadway right-of-way (appraised value <br />$200,000) <br />• Construction proposed for 2017 (pending right of way acquisition) <br />• Alpine Drive Reconstruction <br />• Out for bids <br />• Construction proposed from June 26th through September 22nd (open to traffic August 26th) <br />• Sunwood Drive Reconstruction <br />• Out for bids <br />• Construction proposed from June 26th through September 29th <br />Anoka County Improvement Projects <br />• Hanson Boulevard/CSAH 78 Grade Separation @ BNSF Railway Crossing (2017) <br />• Reconstruct County State Aid Highway 78 (CSAH 78) / Hanson Boulevard to a 4-lane divided section <br />• Construct a grade -separated overpass for Burlington Northern Sante Fe (BNSF) railway crossing <br />• Hanson Boulevard/CSAH 78 Reconstruction (2018) <br />• Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided <br />section <br />• Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />• This project is currently unscheduled and unfunded <br />MnDOT Improvement Projects <br />• Trunk Highway 10 Cable Median Barrier Installation (2018) <br />
The URL can be used to link to this page
Your browser does not support the video tag.