Laserfiche WebLink
The final phase of development would include a pedestrian overpass for Trunk Highway 10 <br />that would connect the park with Ramsey Town Center. Estimated costs for the overpass <br />would mostly likely shared between the MN Department of Transportation, Anoka County <br />and the City of Ramsey. <br />To Historic <br />Kelly Farm <br />Proposed Mississippi <br />\ River Regional Trail <br />- <br />Ivississippi Rivers <br />Ramsey <br />Town <br />Center <br />Legend <br />Pxisling City Trail <br />Proposed City Trail <br />-� Pxisling Regional Trail <br />=rs�k Proposed Regional Trail <br />Regional Park <br />City Park <br />Ramsey Town Center <br />Lake <br />Northslar Comrruter Rail <br />Parcels <br />urm�ole�� <br />edestrian <br />verpass <br />Nfssissippi West <br />Regional Park <br />Cloquet <br />Island <br />Phase 5 Development at Mississippi West Regional Park <br />Phase 5: Pedestrian Connection Estimate <br />Item <br />Total Cost <br />(2010) <br />Design & Engineering Services <br />$ 200,000 <br />Pedestrian Bridge <br />$ 2,000,000 <br />Lighting, Signage & Site Furnishings <br />$ 75,000 <br />Survey/Construction Staking <br />$ 50,000 <br />Geotechnical Survey/Wetland Delineation and Assessment <br />$ 50,000 <br />Permits (City, Watershed, DNR, COE, NPS) <br />$ 10,000 <br />Subtotal <br />$ 2,385,000 <br />Fees and Contingency <br />$ 200,000 <br />Total <br />$ 2,585,000 <br />Page 17 of 22 <br />