Laserfiche WebLink
Appendix G: Capacity Analysis Backup <br />Generated with mg <br />Version 5.00-00 <br />Intersection Settings <br />VISTRO <br />CONSULTING <br />Priority Scheme <br />Stop <br />Stop <br />Free <br />Free <br />Flared Lane <br />No <br />No <br />Storage Area [veh] <br />Two -Stage Gap Acceptance <br />No <br />No <br />Number of Storage Spaces in Median <br />u <br />Movement, Approach, & Intersection Results <br />V/C, Movement V/C Ratio <br />0.00 <br />0.00 <br />0.00 <br />0.38 <br />0.00 <br />0.02 <br />0.01 <br />0.00 <br />j.u0 <br />0.00 <br />d_M, Delay for Movement [s/veh] <br />10.49 <br />12.17 <br />8.40 <br />13.78 <br />14.17 <br />12.96 <br />8.17 <br />7.25 <br />100 <br />0.00 <br />Movement LOS <br />B <br />B <br />A <br />B <br />B <br />B <br />A <br />A <br />A <br />A <br />A <br />A <br />95th-Percentile Queue Length [veh] <br />0.00 <br />0.00 <br />0.00 <br />1.90 <br />1.90 <br />1.90 <br />0.07 <br />0.07 <br />0.07 <br />0.00 <br />0.00 <br />0.00 <br />95th-Percentile Queue Length [ft] <br />0.00 <br />0.00 <br />0.00 <br />47.61 <br />47.61 <br />47.61 <br />1.74 <br />1.74 <br />1.74 <br />0.00 <br />0.00 <br />0.00 <br />d_A, Approach Delay [s/veh] <br />10.35 <br />13.73 <br />2.20 <br />0.00 <br />Approach LOS <br />B <br />B <br />A <br />A <br />d_I, Intersection Delay [s/veh] <br />5.29 <br />Intersection LOS <br />B <br />Scenario 7: 7 2040 Build_ PM Peak <br />Traffic Impact Study G53 Spack Consulting <br />Pearson Farm Residential Development <br />