My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 05/11/2017
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2017
>
Agenda - Parks and Recreation Commission - 05/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:53:07 PM
Creation date
5/23/2017 9:54:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
05/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />S <br />701 Xenia Avenue South I Suite 300 I Minneapolis, MN 55416 I (763) 541-4800 <br />Memorandum <br />To: Tim Gladhill, City of Ramsey <br />From: Breanne Rothstein, WSB & Associates, Inc. <br />Alison Harwood, WSB & Associates, Inc. <br />Date: March 30, 2017 <br />Re: Capstone Homes (Riverstone Addition) EAW Review <br />WSB Project No. 01973-350 <br />On behalf of the City of Ramsey, WSB & Associates, Inc. has reviewed the Pearson Farm Residential <br />Development EAW for compliance with requirements. The following comments were noted during our <br />review: <br />1) Project Title <br />• Page 1 — Include the location in the project title. <br />5) Project Location <br />• Page 2 — For residential development, it is recommended that grading, drainage, or other plans <br />be attached if available. <br />6) Project Description <br />• Page 2 — Figures 3 and 4 show the proposed site plan and a maximum density site plan, but both <br />are referenced for the proposed site plan. Consideration should be made to distinguish between <br />the two in the project description <br />11) Water Resources <br />• Page 11 — for the Table 6, Appendix B reference, the formatting makes it seem like Table 6 is <br />located in Appendix B. Consider reformatting by possibly using semicolon or ampersand symbol. <br />• Page 11 — Include a table that shows the location of the wellhead protection area or other <br />sensitive water management areas. <br />• Page 16 — in the Surface Waters section, include measures taken to avoid or minimize impacts <br />to wetlands, such as an alternatives analysis. <br />12) Contamination / Hazardous Materials / Waters <br />• Page 18 — Include a figure for the WIMN database listings. <br />17) Noise <br />• Page 23 — With the project adjacent to TH 10 a noise analysis should be considered to <br />document the need for future noise walls. Although this is not a requirement, in the future <br />if issues arise MnDOT will not participate in funding of needed walls. It will be the local <br />responsibility. <br />18) Transportation <br />• Page 24 — This section should be updated based on the Traffic Study comments. <br />Figures <br />• On the site plan the access at Bunker Lake Blvd shows a center median. In order to provide lane <br />continuity Bunker Lake Blvd will need to be widened. <br />Appendix E <br />1. Introduction: <br />• Page 1 — the study only include analysis at the intersections closest to the development. <br />Consideration should be given to also evaluating for regional impacts: <br />o Bunker Lake Blvd at Armstrong Blvd <br />o Alpine Dr at Armstrong Blvd <br />Building a legacy — your legacy. <br />Equal Opportunity Employer I wsbeng.com <br />\\gvfiles01 \projects\01973-350\Adm in\Dots\1973-350 - Memo - Capstone Homes EAW Review-033017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.