Laserfiche WebLink
Review File: Trott Brook Addition (CUP, Sketch Plan, Final Plat and Site Plan) <br />April 28, 2017 <br />Page 4 of 4 <br />(Preliminary Plat, and C2). There were no building elevations submitted for the proposed <br />expansion and thus, exterior materials and height are not known at this time. <br />Exterior Finish. City Code Section 117-114 (B-1 General Business District) outlines acceptable <br />exterior wall finishes, which include face brick, stucco, glass, wood, natural stone, specifically <br />designed pre -cast concrete units whose surfaces have been integrally treated with an applied <br />decorative material or texture, or other materials as approved by the City. It is unknown what the <br />proposed exterior materials are for the building addition. This information must be provided. Note <br />that matching the materials of the existing building would be supported by City Staff even if not <br />included in the list of acceptable wall finishes. <br />Building, Parking, and Maneuvering Setbacks. The proposed building expansion appears to be <br />meet or exceed all required setbacks. This also applied to the future expansion for the one (1) <br />story activity center. All proposed parking and maneuvering areas must be setback from the road <br />right-of-way at least twenty (20) feet. It appears that the proposed parking area will need to be <br />adjusted slightly to comply with this setback requirement. That measurement should also be <br />shown on the plan set. <br />Wetland and Stormwater Pond Setbacks. Both wetlands and stormwater ponds require a <br />sixteen and a half foot (16.5 feet) permanent setback around them. This area must be encumbered <br />with a drainage and utility easement. The setback and easement should be identified on the plan <br />set. <br />Landscaping. One (1) tree per 1,000 square feet of building footprint is required along with one <br />(1) tree for every ten (10) new parking stalls. It appears that there are eighty (80) new parking <br />stalls proposed and 3,946 square feet of building expansion. A total of ten (10) new trees shall be <br />provided as part of the project focused primarily around the parking lot. Trees shall be a minimum <br />of two and a half inches (2.5") in diameter (deciduous) or six (6) feet in height (coniferous) and <br />there should be a mix of both coniferous and deciduous trees installed. A landscaping plan, <br />including planting details, shall be provided. <br />Other Permits. The proposed project will disturbed an acre or more of land and includes a <br />wetland delineation. A permit from the Lower Rum River Watershed Management Organization <br />will be required and a copy of which must be submitted to the City. <br />