Laserfiche WebLink
Appendix D: Trip Generation Tables <br />CONSULTING <br />NGLNEERING TRAFFIC FORWARD <br />Weekday Daily Volumes <br />Table D1 <br />Forecasted Trip Generation <br />LAND USE <br />ITE <br />DEVELOPMENT <br />QUANTITY <br />DAILY <br />ENTER <br />EXIT <br />NEW TRIPS <br />ENTER <br />EXIT <br />CODE # <br />UNITS <br />RATE <br />PERCENT <br />PERCENT <br />Single Family Home <br />210 <br />Units <br />246.0 <br />9.52 <br />50% <br />50% <br />1,171 <br />1,171 <br />Townhomes <br />230 <br />Units <br />98.0 <br />5.81 <br />50% <br />50% <br />285 <br />285 <br />Total <br />1,456 <br />1,456 <br />AM Peak Volumes <br />LAND USE <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />QUANTITY <br />PEAK <br />RATE <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />ENTER <br />EXIT <br />Single Family Home <br />Townhomes <br />PM Peak Volumes <br />210 Units <br />230 Units <br />Total <br />246.0 0.75 25% 75% <br />98.0 0.44 17% 83% <br />46 <br />7 <br />53 <br />138 <br />36 <br />174 <br />LAND USE <br />ITE <br />CODE # <br />DEVELOPMENT <br />UNITS <br />QUANTITY <br />PEAK <br />RATE <br />ENTER <br />PERCENT <br />EXIT <br />PERCENT <br />NEW TRIPS <br />ENTER <br />EXIT <br />Single Family Home <br />Townhomes <br />210 <br />230 <br />Units <br />Units <br />Total <br />246.0 <br />98.0 <br />1.00 <br />0.52 <br />63% <br />67% <br />37% <br />33% <br />155 <br />34 <br />189 <br />91 <br />17 <br />108 <br />NOTES: <br />1. All trip generation rates based on "Trip Generation", <br />unless otherwise noted. <br />2. A.M. Trip Generation is for the peak hour of adjacent <br />3. P.M. Trip Generation is for the peak hour of adjacent <br />Institute of Transportation Engineers, 9th Edition <br />street traffic (one hour between 7 and 9 a.m.). <br />street traffic (one hour between 4 and 6 p.m.). <br />Traffic Impact Study D1 Spack Consulting <br />Pearson Farm Residential Development <br />