Laserfiche WebLink
City Engineer Westby stated it could be more problematic to implement FYA operations at <br />different times on Armstrong Boulevard at Sunwood Drive and at Bunker Lake Boulevard. <br /> <br />Chairperson Riley stated it makes sense to move forward with this project, as Anoka County will <br />be making signal system modifications at the same time. <br /> <br />Motion by Councilmember Johns, seconded by Councilmember Kuzma, to recommend City <br />Council authorization to hire SEH, Inc., to prepare plans and specifications for converting the <br />City-owned signal system at the intersection of Armstrong Boulevard/CSAH 83 and Sunwood <br />th <br />Drive/147 Avenue to flashing yellow arrow operations. <br /> <br />Motion carried. Voting Yes: Chairperson Riley, Councilmembers Kuzma and Johns. Voting <br />No: None. <br /> <br />6. COMMITTEE / STAFF INPUT <br /> <br />6:1 Large Diameter Culvert Inspection Report <br /> <br />Public Works Superintendent Riemer reviewed a list of 10 large diameter culverts in the City <br />that were inspected by City Staff and found to be in need of replacement. He added a culvert at <br />th <br />160 Lane is requested to be replaced in 2017, but the others can be delayed for potential <br />inclusion in street improvement projects or Capital Improvements Plan (CIP) additions. He <br />noted plans for replacement of each culvert will be brought to the Public Works Committee for <br />review and consideration. <br /> <br />City Engineer Westby stated roadway reconstruction typically accounts for 1/3 of culvert <br />replacement costs, and road closures will be necessary, but none will cause a dead-end road. <br /> <br /> <br /> <br />6:2 Staff Updates on Improvement Projects and Items of Interest <br /> <br />City Engineer Westby reviewed a list of projects that are either proposed or currently under way. <br />He stated stormwater improvements at Business Park 95 are complete and operational. He added <br />th <br />work is complete on Andrie Street & 164 Lane, and an additional sign is being <br />considered by the park because of comments received from residents. He noted the Mississippi <br />Trail Phase 3 is currently being graded and will be open for use by summer. <br /> <br />City Engineer Westby stated storm sewer extension at Zeolite Street was completed last year. <br />He added the Riverdale Drive extension project and Joint Powers Agreement will be reviewed by <br />the City Council at their April 25, 2017, Regular Meeting. He noted MnDOT is planning to <br />install a cable median barrier along Highway 10 through Ramsey in 2018. <br /> <br />Public Works Committee /April 18, 2017 <br />Page 8 of 10 <br /> <br />