My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 05/23/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:01 PM
Creation date
5/25/2017 11:36:20 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br />RESOLUTION #17-05-119 <br />RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING <br />ADVERTISEMENTS FOR BIDS FOR IMPROVEMENT PROJECT #17-09, BUNKER <br />LAKE BOULEVARD UTILITIES EXTENSION <br />WHEREAS, when Bunker Lake Boulevard was extended west of Armstrong Boulevard <br />in 2006, public utilities (sanitary sewer and watermain) were constructed to a point <br />approximately 2,650 feet west of Bunker Lake Boulevard; and <br />WHEREAS, public utilities were not constructed under the remaining 1,400 feet or so of <br />Bunker Lake Boulevard, east of its intersection with Puma Street; and <br />WHEREAS, a large residential development proposal west of Puma Street that will <br />require public utilities to serve the development is currently under review by the City; and <br />WHEREAS, the developer proposes to complete construction of numerous residential <br />properties in the fall of 2017; and <br />WHEREAS, the existing public utilities under Bunker Lake Boulevard will need to be <br />extended through the intersection of Bunker Lake Boulevard and Puma Street to serve the <br />residential properties within the proposed development; and <br />WHEREAS, extending the public utilities will also allow for development of all other <br />parcels abutting the west end of Bunker Lake Boulevard, as well as along Puma Street to Alpine <br />Drive, which are all located within the Future Business Park area; and <br />WHEREAS, on April 25, 2017 the City Engineer was ordered to prepare plans and <br />specifications for extending public utilities to the west end of Bunker Lake Boulevard. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br />RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />1. The Ramsey City Council hereby approves the final plans and specifications prepared by <br />the City of Ramsey Engineering Depailinent for the making of such improvements, and <br />authorizes the advertisement of bids for the same improvements. <br />Resolution #17-05-119 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.