Laserfiche WebLink
The draft preliminary bridge plans included in the report may <br />be advanced to a complete preliminary plan for review and <br />approval by the MnDOT Bridge Office Preliminary Plan Review <br />Unit. Upon approval of the preliminary plan, the final design <br />and plans may be prepared and reviewed per the Cooperative <br />Construction Agreement Process. <br />Preparation of funding applications and requests for letters of <br />support may begin at this time while other steps outlined above <br />are on -going. <br />j. <br />n 1-1 ..�—ii• -�l' `hIai-. n '1110' <br />Appendix E, Figure 20 - Preferred Concept D View from TH 10 <br />I� j �;;1�� IIIN 'lll1114'�Ill4 I�!,�tll <br />inni,lnlllllll I <br />II nn o 110111111,1H 111111 111111A <br />/I ntrillt 111E <br />■ r r <br />Appendix E, Figure 19- Preferred Concept D View of helix structure from the south <br />Appendix E, Figure 18 - Preferred Concept D Bird's eye view <br />December 2014 <br />Mississippi Skyway OverTH10 Preliminary Engineering Report iv <br />