Laserfiche WebLink
Development would occur in phases. The first phase of development is the design, <br />engineering and construction of a temporary road, boat/canoe launch and fishing pier <br />providing access to the river. <br />TEMPORARY! <br />ACCESS ROAD <br />INTERN; ETIV'. <br />FISHING Ple, <br />PRAIRIE <br />RESTORATION <br />FOSTER <br />ISLAND <br />GATEHOUSE <br />CIOQUET <br />ISLAND <br />OPEN <br />PLAY <br />ESTROORH RISC IL IT <br />`SHELTER <br />PLAYGROUN❑ <br />— OBSERVATION DECK <br />OBSERVATION— <br />DECK <br />Phase 1 Development at Mississippi West Regional Park <br />Phase 1: Boat Launch Development Estimate <br />Item <br />Design/Engineering (in -kind) <br />Boat Launch Road/Parking Lot $ 190,000 <br />Boat Launch $ 40,000 <br />Temporary Access Road $ 50,000 <br />Fishing Pier $ 40,000 <br />Signs $ 5,000 <br />Topographic Survey / Construction Staking $ 10,000 <br />Removal/Demolition of House and Hazard Material Abatement $ 40,000 <br />Permits (City, Watershed, DNR, COE, NPS) $ 5,000 <br />Subtotal $ 380,000 <br />Contingency and Fees $ 20,000 <br />Total $ 400,000 <br />Total Cost <br />(2010) <br />Page 13 of 22 <br />