Laserfiche WebLink
Review File: Stonebrook Academy <br />Final Plat and Site Plan Review: Landscaping <br />May 12, 2017 <br />Page 2 of 2 <br />• Note that each lot, including boulevards, shall be improved with four (4) inches of topsoil <br />meeting the Citv's topsoil specification across all areas not covered with impervious <br />surfacing. Copies of the load tickets shall be provided to the City and a topsoil inspection <br />shall be completed prior to installation of any landscaping. <br />Sheet G1: <br />• Add Tree Save Fencing to this sheet. Tree save fencing shall be installed at the dripline <br />(not the trunk) of trees or around groups of trees. <br />Sheet T1 <br />• Add column headers to the Trees Saved and Trees Removed tables. <br />• Add calculation of total DBH inches on site. <br />• Add calculation of DBH inches to be removed. <br />• Add calculation of DHB inches to be preserved. <br />• Add a column to the table to identify the purpose of removing each tree (credit is <br />granted for trees removed for improvements such as stormwater ponds and trails). <br />• Utilize different symbols for the trees being removed and the trees being preserved. <br />• Add Tree Save Fencing to this sheet. Tree save fencing shall be installed at the dripline <br />(not the trunk) of trees or around groups of trees. <br />• Identify on the plan sheet who conducted their inventory and their credentials. <br />