My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/01/2017
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2017
>
Agenda - Planning Commission - 06/01/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:28:24 AM
Creation date
5/26/2017 9:11:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/01/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seven of the eight lots will gain access from an extension of the Lithium Street cul-de-sac. The eighth lot will retain <br />access from Trunk Highway 47; however, the remainder of the boundary with TH 47 must be shown as restricted <br />access on the Preliminary Plat and Final Plat. It appears that the proposed extension the Lithium Street cul-de-sac <br />does comply with the maximum allowable length and right-of-way width. Sidewalks: <br />There is an existing sidewalk along Lithium Street that presently terminates at the edge of the temporary cul-de-sac. <br />Rather than have a sidewalk terminate mid -block, Staff would recommend that the sidewalk be extended to the <br />northern boundary of the plat, which would allow for future connectivity should the land to the north develop. <br />Grading and Drainage: <br />The project will be subject to review by the Lower Rum River Watershed Management Organization (LRRWMO) <br />regarding both wetlands and stomrwater. A LRRWMO permit will be required. <br />Tree Preservation/Natural Areas <br />The Sketch Plan was reviewed by the Environmental Policy Board at their May 15, 2017 meeting. The City's <br />Natural Resources Inventory indicates there is a moderate quality oak forest across most of the eastern portion of <br />the site that is part of a larger, contiguous natural corridor. The EPB has recommended that conservation design <br />principles and best management practices be incorporated into the project to protect this natural area to the extent <br />possible. <br />Funding Source: <br />All costs associated with processing the Application are the responsibility of the Applicant. There are no City funds <br />proposed to be utilized for the construction of this project. <br />Recommendation: <br />City Staff is recommending that the Planning Commission approve the Sketch Plan and direct the Developer to <br />proceed to preparing a Preliminary Plat, with the considerations listed in the staff report. <br />Action: <br />Provide the Applicant with feedback, and recommend any changes to the Sketch Plan prior to submission of <br />Preliminary Plat. No formal action is required. <br />Attachments <br />Site Location <br />Sketch Plan Set <br />DRAFT EPB Meeting Minutes Dated Mav 15, 2017 <br />Staff Review Letter <br />Form Review <br />Inbox Reviewed By Date <br />Chris Anderson Chris Anderson 05/25/2017 04:43 PM <br />Tim Gladhill Tim Gladhill 05/26/2017 08:15 AM <br />Form Started By: Alec Henderson Started On: 05/25/2017 03:22 PM <br />Final Approval Date: 05/26/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.