My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/12/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 10/12/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:32:41 PM
Creation date
10/11/2004 7:45:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE <br /> <br />CONSIDER JUNIPER RIDGE DRIVE/151sT AVENUE <br /> STORM WATER MODIFICATIONS <br /> By Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />In 2000 modifications were made to the storm sewer system along a portion of Juniper Pddge <br />Dfive which included the segment from 151st Avenue south to the cul-de-sac. A part of these <br />improvements included the construction of an emergency outfall to the Rttm River, wh/ch would <br />be utilized dufing extreme precipitation events. A part of the normal operation 6f the storm <br />water system calls for the ponding of water within a fifty foot drainage and utility easement <br />located along the northerly side of the lot located at 15000 Juniper Ridge Dfive. This ponding <br />area also has as its phmary discharge point another outlet which flows into the pond located <br />between Torito and Ute Streets in the adjacent Juniper Woods subdivision. Subsequent to the. <br />2000 project, a garage was cohstructed on this lot just be.yond the easement. During a recent <br />storm event, storm wate? ponded beyond the easement and came within' a couple of feet of the <br />newly constructed garage. Staff perfon'ned some survey work and determined that the outlet weir <br />was set at an elevation which would cause water to pond beyond the drainage and utility <br />easement prior to discharging through the emergency outfall to the fiver. <br /> <br /> In view of the above, staffhas requested the design engineer do a review of the design criteria to <br />. dete~anine the extent to' which the weir on the emergency outlet ~hould be lowered. It is also <br /> anticipated that additional ponding volume-will be required Within the drainage and utility <br /> easement to ensure the peak elevation of ~he 100 year flood will be contained within the <br /> easement. It is anticipated that the con'ective work will include; lowering the weir-elevation, <br /> increasing the pond areas volume, and filling and resodding a portion of the yard at 15000 <br /> Juniper Ridge Drive, It is knticipated that all work, excepting the landscaping will be performed <br /> by the Public Works depa.rtment. The cost of the landscaping work should be less than $1,000. <br /> <br />Recommendation: <br /> <br />Staff recommends that an analysis of the drainage basin be conducted and that necessary <br />con'ective actions be taken to ensure that the 100 year precipitation event is contained within the <br />drainage and utility easement at a contracted construction cost not to exceed $1,000 which shall <br />come from the storm water utility. <br /> <br />Action: <br /> <br />Motion to recommend to City Council that an analysis of the di-a/nage basin be conducted and <br />that necessary corrective action are taken to ensure that the 100 year precipitation event iS <br />contained within the drainage and utility easement at a contracted construction cost not to exceed <br />· $1,000 which shall come from the storm water Utility. <br /> <br />Reviewed By: <br />Public Works Director/Fire Chief <br />Assistant Public Works Director <br />'Street Maintenance Supervisor <br /> <br />PW: 09/21/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.