My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/12/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 10/12/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:32:41 PM
Creation date
10/11/2004 7:45:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/12/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 <br /> <br />6.0 <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs <br />overhead costs. Construction <br />actual construction. <br /> <br />presented herein reflect the construction and <br />costs are estimated contract amounts for the <br /> <br />Overhead costs include, but are not limited to, engineering, construction staking <br />and inspection, administrative service, legal, and contingency. Overhead costs <br />for the project are estimated based on percentages of construction cost. 'Those <br />percentages are estimated to be as follows: <br /> <br />· Engineering 7% <br /> <br />· Staking & Inspection 6% <br /> <br />· Bonding, Legal, and City Staff Administration 3% <br /> <br />· Contingencies 4% <br /> <br />The summary of estimated cost of construction and overhead are shown below <br />in Table 1. <br /> <br /> TABLE 1 <br /> <br />SUMMARY OF ESTIMATED TOTAL PROJECT COST <br /> <br />· Signal Construction Cost <br />· Bridge Construction Cost . <br />· Street Construction Cost <br />· Storm Drainage Construction Cost <br />· Water Construction Cost <br />· Sanitary Sewer Construction Cost <br />· Total Estimated Construction Cost <br /> <br />$ 500,100 <br />$ 540,000 <br />$2,474,8OO <br />$ 829,264 <br />$ 643,010 <br />$1,049,836 <br /> <br />$6,037,010 <br /> <br />$1,207,402 <br />$7,244,412 <br /> <br />Construction Overhead Cost (20%) <br /> Total Project Cost <br /> <br />In projecting the estimated costs of construction, data from projeCts constructed <br />in the metropolitan area over the last several years and a working knowledge of <br />the construction activity in the area were used. These costs are expressed in <br />current dollars. <br /> <br />METHOD OF PAYMENT <br /> <br />In accordance to the Master Development Agreement for the Ramsey Town <br />Center, the proposed street improvements are to be assessed in accordance <br />with Minnesota Statutes 429. Under this method, the cost of the project would <br />be assessed annually against the property as shown on Exhibit "F" for a period of <br /> <br />Page 5 <br />G:~,M u nicipal~ramsey\3171 \RA3171 FSR.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.