Laserfiche WebLink
Attached are the Draft meeting minutes from City Council's consideration. <br />Observations/Alternatives: <br />It may be reiterated here, that the Park Dedication detail below is for Outlot C. (Outlot D will be developed as a <br />landscaped and irrigated park -like area for the residents of the Riverstone Subdivision —the Developer will not be <br />receiving park Dedication for Outlot D.) Additionally, the Development Agreement will provide full credit for the <br />14' foot greenway trail easement and the associated construction costs. <br />Alternative 2. Outlot C — (Primarily Credit Eligible) <br />This is the Council selected Park Dedication scenario —and directs that the mini -park development be `unique' <br />(nature -based play) and ancillary to greenway trail (either contiguous, or effective and safe pedestrian crossing of <br />adjoining street). No land credit for the mini -park area is calculated under this alternative, as the Developer is <br />requesting the mini -park and deviation from the Park Plan and Park Development Policy. The land dedication for <br />the mini -park (approximately one acre), is thoroughly consistent with the requirements of Planned Unit <br />Development (PUD), which is the land use mechanism under which the Riverstone Subdivision is to be developed. <br />Outlot C 'park' <br />Nature Based Plavground <br />..................................................................................................................................................................................................................................................................................................................................... <br />Landscaping, irrigation (with H2O feature for play area) <br />Pavilion.. <br />Parking (parallel to street) <br />On -street pedestrian safety treatments (50% Park Ded. 50% Developer <br />Benches (4) <br />Drinking fountain and mister w pet attachment <br />Water and sewer services/stubs (Developer expense) <br />Sidewalk(s) parallel to street (Developer expense) <br />Total not -to -exceed Park Dedication credit amount <br />Park Ded. credit <br />................................................................................. <br />$100,000 <br />................................................................................. <br />$100,000 <br />$50,000 <br />................................................................................. <br />$4,620 <br />$5,000... <br />$8,000.... <br />$275,300 <br />Max Credit = $275,300 (if other improvements are desired by the developer E.g. monument/sign, these shall be at <br />the developers expense). <br />The Development Agreement (DA) shall specify that the park shall be developed as a Stage I improvement and be <br />substantially complete by August 1st 2018. Additionally, all improvements and specifications shall be <br />pre -approved by the City, with the Developer bearing all costs of bidding, administration, permitting (if any) as <br />well as construction administration. The park construction agreement (specified within the DA) will be a <br />reimbursable project, with the developer paving all cash Park Dedication owed, with the City issuing associated <br />payment for each improvement as they are completed and accepted —for a total not -to -exceed amount of $275,300. <br />Attached is an example (format and content) of a standard Development Agreement. (The Park Dedication and <br />Trail Fee obligations for Riverstone will be written into the DA at the time City Council approves the Final Plat and <br />Development Agreement.) <br />Funding Source: <br />This case determines the disposition of Park Dedication and Trail Fees as part of the Development Agreement. <br />Recommendation: <br />