My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/08/2017
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2017
>
Agenda - Parks and Recreation Commission - 06/08/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:53:15 PM
Creation date
6/5/2017 11:06:58 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
06/08/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Parking lot (and potential one -leg of round -a -bout) <br />b. Canoe/Kayak kiosk <br />c. Pier with seating at lake (existing CIP project) <br />d. Playground Equipment <br />e. Pavilion <br />f. Athletic Fields (future) <br />g. Other <br />d. Splash Pad and Park Improvements in The COR (development 2-5 years) <br />e. Lake Itasca Greenway Improvements — east of Puma Street (2-5 years) <br />Option 2 — Outlot C or Park C — Primarily Credit Eligible — May 11, 2017 Staff Recommendation <br />provided the mini -park development "unique" (nature -based play) and ancillary to greenway trail <br />(either contiguous, or effective and safe pedestrian crossing of adjoining street). No land credit for <br />the mini -park area is calculated under this scenario, as the developer is requesting the mini -park <br />and deviation from the Park Plan and Park Development Policy. The land dedication for the mini - <br />park (approximately one acre) is thoroughly consistent with the requirements of Planned Unit <br />Development (PUD), which is the land use mechanism under which Riverstone is to be developed. <br />Park C or Outlot C Park Ded. <br />Nature Based Playground $100,000 <br />Landscaping, irrigation (with H2O feature for play area) $100,000 <br />Pavilion $50,000 <br />Parking (parallel to street) $4,620 <br />Pedestrian safety treatments (50% Park Ded. 50% developer) $5,000 <br />Benches(4) $7,680 <br />Drinking fountain and mister w pet attachment $8,000 <br />Water and sewer services/stubs (developers expense) <br />Sidewalk(s) along Park C (developers expense) <br />Total not -to -exceed Park Dedication credit amount $275,300 <br />a. Max Credit - $275,300 (if other improvements are desired by the development e.g. <br />monument/sign, these shall be at the developer's expense). <br />The Development Agreement (DA) shall specify that the park shall be developed as a Stage <br />I improvement and be substantially complete by August 1, 2018. Additionally, all <br />improvements <br />and specifications shall be pre -approved by the City, with the Developer bearing all costs <br />of bidding, administration, permitting (if any) as well as construction administration. The <br />park construction agreement (DA) will be a reimbursable project, with the developer <br />paying all cash Park Dedication owed, with the City issuing associated payment for each <br />improvement as they are completed and accepted — for a total not -to -exceed amount of <br />$275,300, <br />Park and Recreation Commission/May 11, 2017 <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.