My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 06/08/2017
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2017
>
Agenda - Economic Development Authority - 06/08/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:14:37 PM
Creation date
6/6/2017 11:37:51 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
06/08/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Economic Development Authority (EDA) <br />Meeting Date: 06/08/2017 <br />Submitted For: Patrick Brama, Administrative Services <br />By: Patrick Brama, Administrative Services <br />Title: <br />PSD LLC Business Park: Approve MOU Related to New Internal Public Roadway <br />Purpose/Background: <br />***this case is 1 of 3 cases related to the new PSD business park*** <br />4. 3. <br />PURPOSE <br />Consider approving the attached Memorandum of Understanding (MOU). The attached MOU indicates the City of <br />Ramsey is willing to fund a not -to -exceed $250,000 for the first phase of required public roadway located within <br />the new PSD business park. The City would utilize the EDA Fund, ACHRA Fund, and/or TIF District #1 Funds for <br />this project. <br />BACKGROUND <br />Attached to this case is background information on the proposed PSD Business Park (basic background, maps, and <br />visual renderings). Also attached is a breakdown of the assistance requests made by PSD to the City. Lastly, <br />attached is a QA Log on the City's policy for cost -sharing public infrastructure. <br />The EDA and City Council generally reviewed this request in April. At the time, both the EDA and City Council <br />appeared to be generally open to further considering this request. <br />Notification: <br />Observations/Alternatives: <br />Per the attached MOU (appendix) --the proposed internal public roadway will be about 1,200' lineal feet. The entire <br />1,200' roadway section shown will be constructed by PSD in 2017. PSD is requesting reimbursement from the City <br />for 500' of the internal public roadway (or about 42% of the total lineal feet). <br />Per the attached Infrastructure Policy QA Log --staff believes this request is reasonable, and falls within the City's <br />past practice/ policy positions. In summary, in the past, the City typically has paid for all (100%) or a portion (60%) <br />of public infrastructure located within industrial parks/ commercial areas. <br />Staff discussed this request with Ehlers. Both staff and Ehlers do not believe this request should be processed as a <br />formal business subsidy request. This request should be considered a stand alone infrastructure negotiation process <br />(which is common for new green -field projects, especially for commercial/ industrial projects). As a result, this <br />request has not been formally underwritten and staff has not requested a pro -forma from the developer. <br />Funding Source: <br />EDA Fund, ACHRA Fund, and/or TIF 1. If the project continues to move forward, staff will need to formalize this <br />item. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.