Laserfiche WebLink
Review File: Stonebrook Academy <br />Final Site Plan Submittal <br />Engineering Review <br />May 23, 2017 <br />Page 3 of 5 <br />Sheet 9 <br />1. Show the ROW width on the typical section. <br />2. The City standard street section is 1 1/2" Bituminous Wear, 2" Bituminous Base and 4" <br />Class 5. <br />3. The clear zone between the sidewalk and ROW is 1'. <br />Sheet 11 <br />1. Add note to storm sewer removal "Remove pipe to structure and bulkhead." <br />2. Reference Detail STR25 at the pavement removal area. <br />3. Callout quantity of bituminous pavement to remove and quantity of concrete pavement to <br />remove. <br />Sheet 12 <br />1. The castings shall be R-3267 with grated back. <br />2. Label all pipes in profile view. <br />3. Specify rim elevations. <br />4. Call out pipe outside of ROW "by others" or show length, slope, invert elevation and rim <br />elevation. <br />Sheet 13 <br />1. The sewer and water lines must be darker on this sheet, the storm sewer lines must be <br />lighter on this sheet. <br />2. Provide stationing for proposed services and structures. The watermain parallel to the street <br />must be 8" DIP. <br />3. Specify the invert elevations for the sanitary sewer services. <br />Sheet 14 <br />1. Add note "Streets shall be cleaned within 3 hours after notification by City that sweeping <br />is required". <br />2. A custom detail is required for each pedestrian ramp. Three pedestrian ramps are required, <br />2 at the new driveway entrance and 1 at the southwest corner of Yolite Street and Veterans <br />Drive. <br />Sheet 16 <br />1. The City makes and installs the signs. <br />Stormwater Calculations <br />A stormwater summary report was submitted and reviewed. The report must be updated to <br />include the 2 year event. Infiltration mitigation calculations were submitted. The City has <br />developed a standardized model for calculating the contribution to the infiltration mitigation <br />fund and proposes that the contribution be $ 6,355. Our calculations are shown below. We <br />included importing 1 foot of growing medium between the native soils and the bottom of the <br />basin. <br />