Laserfiche WebLink
SHEETS <br />10 <br />OF <br />SHEET <br />7 <br />8+50STA8MATCH TO SHEET <br />SUNWOOD DRIVE STRIPING IMPROVEMENTS <br />8+00 <br />17-04 <br />CITY OF RAMSEY, MINNESOTA <br />CITY PROJECT NO. <br />7+00 <br />ERTS ETILOY <br />)ERUTUF( TE <br />S <br />4 <br />S <br />4 <br />STRIPING PLAN STA. 0+00 TO 8+50 <br />0 <br />0 <br />+ <br />6 <br />5+00 <br />D <br />4 <br />PID 283225240009 <br />7800 <br />6 2110 FA 6  <br />E <br />V <br />I <br />0 SUNOOD DRIVE <br />RAMSEY, MN 0 <br />R <br />0 <br />0 <br />+ <br />D 4 <br /> <br />D <br />O <br />O <br />W <br />N <br />U <br />S <br />0 <br />0 <br />+ <br />3 <br />S <br />6/7/17 <br />17-04 <br />4 <br />FILE No. <br />DATE: <br />DESIGNED BY: <br />S <br />CHECKED BY: <br />DRAWN BY: <br />4 <br />JJF <br />JJFBRW <br />D <br />0 <br />4 <br />0 <br />+ <br />Licensed <br />prepared <br />2 <br />Professional Engineer under the laws of the State of Minnesota <br /> <br /> <br />duly <br />was <br /> <br /> <br />report <br />a <br /> <br />40116 <br />am <br /> <br />I <br /> <br /> <br />that <br />or <br /> <br />specification, <br /> <br />and <br />Lic. No. <br />BRUCE WESTBY <br /> <br />supervision <br /> <br />plan, <br /> <br />direct <br /> <br />this <br />6/7/17 <br /> <br /> <br />that <br />my <br /> <br /> <br />under <br />0 <br />certify <br />0 <br />+ <br />Date <br />1 <br /> <br /> <br />or <br />hereby <br /> <br />me <br /> <br />by <br /> <br />I <br />G:\\Engineering\\AutoCad Dwgs\\Projects N-Z\\Sunwood Drive Striping - 17-04\\Plan Drawings\\Sunwood Drive Striping - 2017.dwg <br />STA. 0+82 <br />BEGIN PROPOSED STRIPING <br />LOEZ <br />TEERTS ETI <br />STRIPING WEST OF ZEOLITE <br />0 <br />0 <br />+ <br />0 <br />7876 <br />REVISION <br />BY OTHERS <br /> Jun 07, 2017 - 9:37am <br />DATE <br />E <br />V <br />I <br />R <br />D <br /> <br />D <br />O <br />O <br />W <br />N <br />U <br />S <br /> <br />