My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
provision, after notice, shall be a material breach of this Agreement and may result, at the Owner's <br />option, in a termination or suspension of this Agreement in whole or in part. <br /> <br />10.3 The Contractor will pay all sales, consumer, use and other similar taxes required by the law of <br />the place where the Work is to be performed. <br /> <br />ARTICLE 11. Availability of Lands; Physical and Subsurface Conditions; Reference Points <br /> <br />11.1 The Owner will provide, as indicated in the Contract Documents and not later than the date <br />when needed by the Contractor, the lands upon which the Work is to be done, rights-of-way for access <br />thereto, and such other lands which are designated for the use of the Contractor, the Contractor will <br />provide all additional lands and access thereto that may be required for temporary construction facilities <br />or storage of materials and equipment. <br /> <br />11.2 The Contractor will properly notify the Owner and Engineer in writing of any subsurface or <br />latent physical conditions at the site differing materially from those indicated in the Contract <br />Documents. The Engineer will promptly investigate those conditions and advise the Owner in writing <br />if further surveys or subsurface tests are necessary. Promptly thereafter, the Owner will obtain the <br />necessary additional surveys and tests and furnish copies to the Engineer and the Contractor. If the <br />Engineer finds that the results of such surveys or tests indicate subsurface or latent physical conditions <br />differing significantly from those indicated in the Contract Documents, a Change Order shall be issued <br />incorporating the necessary revisions. <br /> <br />11.3 The Engineer will establish such general reference points as in his judgment will enable the <br />Contractor to proceed with the Work. The Contractor will be responsible for the layout cf the Work <br />and will protect and preserve the established reference points and will make no changes or relocations <br />without the prior written approval of the Owner and Engineer. He will report to the Engineer whenever <br />any reference point is lost or destroyed or requires relocation because of necessary changes in grades <br />or locations. The Contractor will replace and accurately relocate all reference points so lost, destroyed <br />or moved. <br /> <br />ARTICLE 12. Use of Premises <br /> <br />12.1 The Contractor will confine his equipment, the storage of materials and equipment and the <br />operations of his workmen to areas permitted by law, ordinances, permits or the requirements of the <br />Contract Documents, and shall not unreasonably encumber the premises with materials or equipment. <br /> <br />12.2 The Contractor will not load nor permit any part of the structure to be loaded with weights that <br />will endanger the structure, nor will he subject any part of the Work to stresses or pressures that will <br />endanger it. <br /> <br />ARTICLE 13. Engineer's Status During Construction <br /> <br />13.1 The Engineer shall be the Owner's representative during the construction period. All <br />instructions of the Owner to the Contractor shall be issued through the Engineer. The duties and <br />responsibilities and the limitations of authority of the Engineer as the Owner's representative during <br />GC 11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.