My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/20/2017
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2017
>
Agenda - Public Works Committee - 06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:08:07 AM
Creation date
6/16/2017 10:23:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
data shown on the Shop Drawings will be complete with respect to dimensions, design criteria, <br />materials of construction and the like to enable the Engineer to review the information as required. <br /> <br />15.2 The Contractor will also submit to the Engineer for approval, with such promptness as to cause <br />no delay in Work, all samples required by the Contract Documents. All samples will have been checked <br />by and stamped with the approval of the Contractor, identified clearly as to material, manufacturer, any <br />pertinent catalog numbers and the use for which intended. <br /> <br />15.3 At the time of each submission, the Contractor will, in writing, call the Engineer's attention to <br />any deviations that the Shop Drawing or sample may have from the requirements of the Contract <br />Documents. <br /> <br />15.4 The Engineer will check and approve with reasonable promptness Shop Drawings and samples; <br />however, checking and approval shall be only for conformance with the design concept of the Project <br />and for compliance with the information given in the Contract Documents. The approval of a separate <br />item as such will not indicate approval of the assembly in which the item functions. The Contractor <br />will make any corrections required by the Engineer and will return the required number of corrected <br />copies of Shop Drawings and resubmit new samples until approved. The Contractor shall direct <br />specific attention in writing or on resubmitted Shop Drawings to revisions other than the corrections <br />called for by the Engineer on previous submissions. <br /> <br />15.5 No Work requiring a Shop Drawing or sample submission shall be commenced until the <br />submission has been approved by the Engineer. <br /> <br />15.6 The Engineer's approval of Shop Drawings or samples shall not relieve the Contractor from his <br />responsibility for any deviations from the requirements of the Contract Documents unless the <br />Contractor has in writing the Engineer's attention to such deviations at the time of submission and the <br />Engineer has given written approval to the specific deviation, nor shall any approval by the Engineer <br />relieve the Contractor from responsibility for errors or omissions in the Shop Drawings. <br /> <br />ARTICLE 16. Tests and Inspections <br /> <br />16.1 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority <br />having jurisdiction require any Work to specifically be inspected, tested, or approved by someone other <br />than the Contractor, the Contractor will give the Engineer timely notice of readiness thereof. The <br />Contractor will give the Engineer the required certificates of inspection, testing or approval. All such <br />tests will be in accordance with the methods prescribed by the American Society for Testing and <br />Materials or such other applicable organization as may be required by law or the Contract Documents. <br />If any such Work required so to be inspected, tested, or approved is covered up without written approval <br />or consent of the Engineer, it must, if directed by the Engineer, be uncovered at the Contractor's expense <br />for observation. The cost of all such inspections, test and approvals shall be borne by the Owner unless <br />otherwise provided. <br /> <br />16.2 Any Work which fails to meet the requirements of any such test, inspection or approval and any <br />Work which meets the requirements of any such test or approval but does not meet the requirements of <br />the Contract Documents shall be considered defective. Such defective Work may be rejected, corrected <br />GC 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.