My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 11/10/2004
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2004
>
Agenda - Economic Development Authority - 11/10/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:37:24 PM
Creation date
11/4/2004 10:26:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
11/10/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREMIER IMAGE MONUMENT COMPANY <br />20188 PASCAL ST NW <br /> ELK RIVER, MN 55330 <br /> 763-441-8138 <br /> <br />ORDER ACKNOWLEDGEMENT <br /> <br /> TO: Ramsey EDA Date: October 29, 2004 <br /> For: Ramsey Business Park/design #18 C.K.H. <br /> We quote you as follows, prices based on delivery by our trucks to building site, unless otherwise specified. <br /> <br />All materials and labor for the following monument: <br /> <br />· One Concrete footing <br />· Two block pillars approx. 32"x 20" x 6' tall with Limestone banding detail as per <br /> design . <br />· Two lndiana Limestone caps approx. 35" x 23" x 4" thick rock faced on 4 sides <br />· One Indiana Limestone sign Approx. 48" x 8'x 2 ¼" thick, cut, sandblasted, and <br /> painted as per approved design. Two sided with 3-color allowance <br /> <br />Total cost, including tax - $11,188.00 <br /> <br />Additional Options: · Kasota Limestone sign and caps - add $425.00 <br /> · If only a one sided sign - deduct $1993.00 <br /> <br /> Ail dimensions are approximate. <br /> <br />Price is based on level Grade. Any site preparation, landscape, electrical, and sign <br />permit are thc responsibility of the owner/developer. <br /> <br />TERMS: 50% DOWN, BALANCE UPON COMPLETION. (Any unpaid balance is <br />subject to 1.5% interest charged monthly.) <br /> <br />Accepted by. Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.