My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SALT Schedule of Materials Control - Local Government Agency <br />2301 CONCRETE PAVEMENT - AGENCY 1 of 2 * <br />Test Type <br />(concrete manual) <br />Gradation (1) <br />(5-694.145) <br />(5-694.148) <br />Aggregate <br />Moisture - QC <br />Verification (2) <br />(5-694.142) <br />Water Content, <br />Microwave Oven <br />Verification (3) <br />(5-694.532) <br />Coarse <br />Aggregate, <br />-200 sieve <br />(5-694.146) <br />Coarse and Fine <br />Aggregate Quality <br />(4) <br />Alkali Silica <br />Reactivity (ASR) <br />Testing <br />Coarse Aggregate <br />Quality Testing of <br />Incentive / <br />Disincentive <br />Concrete <br />Manual <br />Spec. <br />Concrete Paving Batch Plant Certified Ready -Mix Plant <br />Agency Testing Agency Testing <br />Test the first 4 QA samples of production each time the Contractor <br />3126 mobilizes the plant in a calendar year or changes aggregate sources. <br />3137 <br />1 per day randomly thereafter. <br />If w/c incentives apply: 1 per 1000 <br />3126 yd3 or every 4 hours, whichever is <br />3137 greater. Take initial sample within <br />the first 250 yd3. <br />Take initial sample within the first <br />250 yd3. At least one additional <br />verification test should be taken if <br />more than 1000 yd3 is produced in <br />a day. <br />1 per 1000 yd3 or 1 per week <br />whichever is higher, randomly. <br />If w/c incentives apply: 1 per 200 <br />yd3 or every 4 hours, whichever is <br />greater. Take initial sample within <br />the first 100 yd3. <br />Take initial sample within the first <br />100 yd3. At least one additional <br />verification test should be taken if <br />more than 400 yd3 is produced in a <br />day. <br />1 randomly selected sample on the first day of production and each <br />time the Contractor mobilizes the plant, changes the aggregate <br />3137 sources, or the cleanliness of the coarse aggregate is in question, then <br />1 per week randomly thereafter. -200 test may be performed at the lab <br />instead at the plant at the discretion of the Engineer. <br />During concrete production: 1 randomly selected test each fraction <br />every 20,000 yd3 of production. Split the Quality sample 4 ways: 1) <br />3126 Provide 2 quarters of the sample to the producer/contractor. 2) Test <br />3137 the -200 on the coarse aggregate at the plant the day it was sampled. <br />3) Submit the remaining sample to the lab for quality testing including <br />testing the -200 sieve on the coarse aggregate. <br />1 per paving project per sand source. Provide one 5 Ib. sample of: <br />cement, supplementary cementitious material (fly ash or slag), and <br />2301 sand. Write "Project Specific ASR Testing" on all 3 sample cards. <br />ASR Testing is not required if the entire project is less than 3,500 <br />cubic yards. <br />If coarse aggregate quality incentives apply: Test the Class B <br />aggregates for % absorption and Class C aggregates for % carbonate <br />including any other test necessary to make those determinations. <br />Sample the 2 largest fractions in accordance with the following table <br />and 2301: <br />Coarse Aggregate Quality Incentive/Disincentive Sampling Rates <br />3137 <br />Plan Concrete Cubic Yards <br />3,500 - 7,500 <br />7,501 - 10,000 <br />10,001 - 25,000 <br />25,001 - 50,000 <br />50,001 + <br />Samples per fraction <br />3 <br />5 <br />10 <br />15 <br />20 <br />Form <br />21764 Agg <br />Work sheet <br />Concrete <br />W/C Ratio <br />Work sheet <br />21764 Agg <br />Work sheet <br />2410 <br />Sample ID <br />Card <br />2410 <br />24300 <br />24308 <br />Coarse <br />Agg Quality <br />Incent / <br />Disincent <br />Work sheet <br />*Use Certified Ready -Mix Concrete testing rates when: a) The entire concrete paving project is less than 3,500 <br />cu.yd. b) When a secondary plant is used to provide minor work. <br />Agencies using MnDOT Metro Inspection Services will be sampled at the current MnDOT Schedule of <br />Materials Control rates and will be billed accordingly. Contact the MnDOT District IA Inspector to provide <br />servicing of your Federal Aid Project. <br />2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.