My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SALT Schedule of Materials Control - Local Government Agency <br />Metals 1 of 2 <br />Kind of Material <br />Guard Rail <br />Fittings - Splicers, Bolts, <br />Posts etc. <br />Structural Plate Beam <br />Non -High Tension Guard <br />Rail Cable <br />High Tension Guard Rail <br />Cable <br />Steel Posts <br />Steel Sign Posts <br />Fence Posts, Brace Bars, <br />Rails and others <br />Fence <br />Barbed Wire <br />Woven Wire <br />Chain Link Fabric <br />Components: cup, cap, nut, <br />bolt, end clamp, tension <br />band, truss rod tightener, <br />hog ring, tie wire, tension <br />stretcher bar, truss rod, <br />clamp & tension wire <br />Gates <br />Pipe <br />Water Pipe and other <br />Piping Materials <br />Spec. No. <br />3381 <br />3382 <br />3381 <br />Special <br />Provisions <br />3401 <br />Min. <br />Required Acceptance Testing (Field Testing Rate)* <br />Visual Inspection - Materials shall be approved before use. <br />Call MnDOT inspector at 218-846-3613 to see if <br />material has been approved. <br />Visual Inspection - As directed by the Engineer. <br />Retain Certificate of Compliance in Project file. <br />3403 Visual Inspection - As directed by the Engineer. <br />3406 Retain Certificate of Compliance and certified <br />3379 mill analysis in project file. <br />3376 <br />3379 <br />3364, 3365, <br />3366 & <br />Special <br />Provisions <br />Visual Inspection <br />Retain Certification of Compliance, <br />As directed by the Engineer. <br />Visual Inspection - As directed by the Engineer. <br />Reinforcing Steel - Inspected by MnDOT & will be charged back to the Local Agency. <br />Uncoated Bars <br />Epoxy Coated Bars <br />Spirals <br />Stainless Steel Bars <br />3301 Retain Certificate of Compliance & Certified Mill Analysis <br />For Epoxy -Coated bars, steel will be tagged "Inspected" when it has <br />been sampled and tested by Mn/DOT prior to shipment, & it will be <br />tagged "Sampled" when testing has not been completed prior to <br />shipment. If the Epoxy -Coated bars are not tagged "Sampled" or <br />"Inspected", submit samples (1 bar 3ft long for each size for each <br />days coating production), Certificate of Compliance, & Certified Mill <br />Analysis for testing. Maintain original Cert. of Compliance & Certified <br />Mill Analysis in project file. <br />Special Visual Inspection Testing as directed by the Engineer (2 bars 3 ft. <br />Provisions long per heat per bar size). Certified Mill Test Reports to be filed. <br />3301 <br />3305 <br />2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.