My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
twenty (20) Calendar Days of presentation of an approved application for payment, and receipt of <br />final payment documents pay the Contractor the amount approved by the Engineer. <br />ARTICLE 30. Retention of a Portion of the Contract Sum <br />The Owner may retain up to a maximum of ten percent (10%) of value of Work completed and <br />requested for payment. After fifty percent (50%) of the Work has been completed, the Contractor <br />may request consideration for a reduction in the retained amount. Where the Owner is subject to the <br />provisions of Minnesota State Statutes 429.041 the maximum retained amount shall be five percent <br />(5%) released with approval of the governing body. Those amounts released shall be considered not <br />required to be retained to protect the Owner's interest in satisfactory completion of the Agreement. <br />ARTICLE 31. Liquidated Damages <br />The parties hereto recognize that failure on the part of the Contractor to complete the Work within the <br />time period set forth herein above, shall cause damage to the Owner; and should the contractor not <br />complete the Work within that period of time, or otherwise be guilty of substantial violation of this <br />Agreement, the Owner may deduct amounts per the following schedule per calendar day after the <br />completion date and all legal and Engineering costs related thereto, for each day exceeding said <br />completion date, from the total Contract Price to be paid to the Contractor, and among its other <br />remedies, terminate this Agreement and complete the Work by whatever method the Owner may <br />deem expedient, at the expense of the Contractor; and such action by Owner shall not relieve <br />Contractor of its liability to Owner for any damages caused by the Contractor's default, including, but <br />not limited to, the excess expense of finishing the Work over the unpaid balance of the Contract <br />Price. In the event a dispute arises between the Contractor and Owner regarding an alleged default by <br />the Contractor or the assessment of liquidated damages, and if said dispute is submitted for litigation, <br />and in the further event that the Owner prevails thereon, liquidated damages shall include court costs <br />and reasonable attorney's fees as allowed by law. In the event the Owner elects to complete the Work <br />following Contractor's default as above set forth, the Contractor agrees to extend its full cooperation <br />of the Work contemplated under this Agreement. The amount deducted under this paragraph shall <br />not be construed as a penalty, but rather as liquidated damages resulting from the noncompletion of <br />the Work within the specified time. The schedule of damages shall be as specified below based upon <br />the original contract amount: <br />From More Than Up To and Including Charge per Calender Day <br />$0 $500,000 $200 <br />$500,000 $1,000,000 $300 <br />$1,000,000 Unlimited $500 <br />ARTICLE 32. Waivers of Claims and Continuing Obligations <br />32.1 The Contractor's obligation to perform the Work and complete the Project in accordance with <br />the Contract Documents shall be absolute. Neither approval of any payment by the Engineer, nor the <br />issuance of a certificate of completion, nor any payment by the Owner to the Contractor under the <br />Contract Documents, nor any use or occupancy of the Project or any part thereof by the Owner, nor <br />any act of acceptance by the Owner nor any failure to do so, nor any correction of faulty or defective <br />GC 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.