My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Permits <br />The Contractor will be required to obtain a NPDES Stormwater Construction Permit from the <br />Minnesota Pollution Control Agency, and a City contractor's license. <br />9. Barricades, Guards and Safety Euuinment <br />To protect persons from injury and to avoid property damage, adequate barricades, construction <br />signs, warning lights, and guards as required shall be placed and maintained by the contractor <br />during the progress of the construction work. All material piles, excavation equipment, and <br />materials which may serve as obstructions to traffic or hazards shall be enclosed by fences or <br />barricades and shall be protected by adequate lighting when visibility is poor. The rules and <br />regulations of local authorities respecting safety provisions shall be observed. <br />10. Preconstruction Conference Required <br />Prior to initiating the work a preconstruction conference shall be scheduled and held with the <br />contractor and his subcontractors, the City, utility companies (including fiber optic lines) or others <br />with an interest in the project. The Contractor shall submit documentation for review at the <br />preconstruction conference which: identifies construction personnel responsible for the work and <br />project safety; provides a list of emergency or after hour contacts with their afterhours phone <br />numbers; and identifies subcontractors and material suppliers. The Contractor shall prepare and <br />submit a written schedule of the work, identifying work components and showing work start and <br />completion dates required to comply with the schedule in the contract documents. The Contractor <br />shall prepare and submit a list of material submittals that are required to comply with specified <br />standards and will submit certificates of compliance or a schedule for compliance submittal. <br />No work is authorized on the project until the Notice to Proceed is issued. Once work has <br />commenced, the Contractor shall continuously pursue completion in accordance with the approved <br />schedule. <br />11. Construction Stakine <br />Construction staking shall be provided by the City Engineering department. The Contractor shall <br />provide a 48 hour notice for initial grade stakes and 24 hour notice for replacement stakes. All <br />replacement staking shall be paid for by the Contractor. <br />12. Protection of Utilities <br />The Contractor is advised that utilities which include electric, gas, telephone, cable TV, fiber optic <br />lines, sanitary sewer, storm sewer, and watermain are located within or near the project area <br />anticipated for excavation. It is the Contractor' s responsibility to obtain all locations from the <br />SP 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.