Laserfiche WebLink
A Water Pipe Materials 21 <br />Al Ductile Iron Pipe and Ductile Iron and Gray Iron Fittings 22 <br />A3 Polyvinyl Chloride (PVC) Pressure Pipe and Fittings 22 <br />A4 Polyethylene (PE) Pressure Pipe and Fittings 23 <br />B Fire Hydrants 23 <br />C Valves and Valve Housing 24 <br />Cl Valve Housings 24 <br />C2 Gate Valves 24 <br />C3 Butterfly Valves 25 <br />D Water Service Pipe and Fittings 25 <br />E Polyethylene Encasement Material 26 <br />F Mechanical Joint Restraints 26 <br />G Mortar 26 <br />H Concrete 26 <br />Tracer Wire for Non -Conductive Pipe 26 <br />2611.3 CONSTRUCTION REQUIREMENTS 27 <br />A Installation of Pipe and Fittings 27 <br />Al Inspection and Handling 27 <br />A2 Pipe Laying Operations 27 <br />A3 Aligning and Fitting of Pipe 28 <br />A4 Blocking and Anchoring of Pipe 28 <br />A5 Polyethylene Encasement of Pipeline 29 <br />B Connection and Assembly of Joints 30 <br />B1 Ductile Iron Pressure Pipe and Fitting Joints 30 <br />B3 Polyvinyl Chloride Pipe Joints 31 <br />B3 Polyethylene Pipe Joints 31 <br />B4 Tracer Wire for Non-conductive Pipe 31 <br />C Water Service Installations 32 <br />Cl Tee Branch Service Lines 32 <br />C2 Tapped Service Lines 32 <br />D Setting Valves, Hydrants, Fittings and Specials 33 <br />E Disinfection of Watermains 34 <br />F Electrical Conductivity Test 35 <br />G Hydrostatic Testing of Watermains 35 <br />H Operational lnspection 36 <br />2611.4 METHOD OF MEASUREMENT 36 <br />A Water Pipe 36 <br />B Valves 36 <br />C Corporation Stops 36 <br />D Curb Stops 36 <br />E Hydrants 36 <br />F Air Vents 36 <br />G Polyethylene Encasement 37 <br />H Ductile and Gray Iron Fittings 37 <br />Polyvinyl Chloride or Polyethylene 37 <br />J Access Structures 37 <br />2611.5 BASIS OF PAYMENT 37 <br />