My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A6 Temporary Service Measures <br />While any open excavations are maintained, the Contractor shall have available a supply of <br />steel plates suitable for temporary bridging of open trench sections where either vehicular or <br />pedestrian traffic must be maintained. Use of the plates shall be as directed or approved by the <br />Engineer and where installed they shall be secured against possible displacement and be <br />replaced with the permanent structure as soon as possible. <br />B Excavation and Preparation of Trench <br />B1 Operational Limitations and Requirements <br />Trench excavation must conform to all local, state and federal requirements. All work must be <br />confined to the limits of the construction and to easements and right of way as indicated on the <br />plans. The Contractor shall install at his expense the necessary trench support to meet the <br />varying soil conditions and to protect existing structures and property. The trench shall be <br />drained to provide stable excavation and permit the pipe to be laid in a dry trench. <br />Excavating operations shall proceed only so far in advance of pipe laying as will satisfy the <br />needs for coordination of work and permit advance verification of unobstructed line and grade <br />as planned, consistent with the Contractors methods and scheduling. Where interference with <br />existing structures is possible or in any way indicated, and where necessary to establish <br />elevation or direction for connections to in -place structures, the excavating shall be done at <br />those locations in advance of the main operation so actual conditions will be exposed in <br />sufficient time to make adjustments without resorting to extra work or unnecessary delay. <br />Wherever possible, excavated materials shall be placed in areas that will not block existing <br />vehicle and pedestrian traffic and drainage ways. The Contractor shall review proposed <br />methods of operation with the Engineer prior to beginning the work. <br />The Contractor shall backfill all trenches at the end of each work day, or upon written <br />authorization of the Engineer, shall provide another approved method of protecting the trench <br />area while work is not being performed. <br />All installations shall be accomplished by open trench with the exception that boring, jacking and <br />tunnel construction methods shall be employed where specifically required by the Plans, <br />Specifications, or Special Provisions. <br />The excavating operations shall be conducted so as to carefully expose all existing underground <br />structures without damage. Wherever the excavation extends under or approaches so close to <br />an existing structure as to endanger it in any way, precautions and protective measures shall be <br />taken as necessary to preserve the structure and provide temporary support. Hand methods of <br />excavating shall be utilized to probe for and expose such critical or hazardous installations as <br />gas pipe, power and communication cables, watermain, gravity and pressure sewers, and <br />respective service pipes. <br />The Engineer shall be notified of any need for blasting to remove materials which cannot be <br />broken up mechanically, and there shall be no blasting operations conducted until the <br />Engineer's approval has been secured. Blasting will be allowed only when proper precautions <br />are taken to protect life and property, and then shall be restricted as the Engineer directs. The <br />hours of blasting operations shall be set by the Owner. The Contractor shall assume full <br />Page 7 <br />