Laserfiche WebLink
(5) Ash (ash from burning of regulated materials may contain lead, asbestos or other <br />chemicals). <br />(6) Sandblast residue (could contain lead). <br />(7) Treated wood including, but not limited to products referred to as green treat, brown <br />treat and creosote (treated wood disposal is regulated). <br />(8) Chemical containers such as storage tanks, drums, filters and other containers <br />(possible sources of chemical contaminants). <br />(9) Old basements with intact floor tiles or insulation (could contain asbestos), sumps <br />(could contain chemical waste), waste traps (could contain oily wastes) and <br />cesspools (could contain chemical or oily wastes). <br />Discovery of contaminated soil, contaminated water, or regulated waste on State right of way, <br />State property, and State funded projects shall be handled in accordance with guidance <br />procedures of the MNDOT Office of Environmental Services (OES) and the MPCA requirements <br />for materials handling, disposal, re -use and remediation. <br />Discovery of contaminated soil, contaminated water, or regulated waste on projects or <br />properties that are not under the ownership or financed by the State shall be handled in <br />accordance with guidance procedures of the MPCA requirements for materials handling, <br />disposal, re -use and remediation. <br />C Trenchless Pipe Installation <br />The Contractor shall inspect and verify soil conditions as necessary in order to determine the <br />type of construction to employ. Natural and/or manmade obstructions may be encountered in <br />the soil. These contract documents do not warrant the nature or condition of the soils, and do <br />not warrant that natural or manmade obstructions will not be encountered, nor guarantee the <br />extent to which rocks, boulders, or other obstructions, regardless of size, may be encountered <br />during boring operations. The Contractor shall not be entitled to additional compensation for any <br />natural or manmade obstructions encountered during trenchless construction. <br />The Contractor shall be responsible for protecting all existing utilities within the construction <br />limits. <br />C1 Jacking/Boring <br />The terms "auger", "boring", "jack", "jacking", and "tunneling" in the proposal, specifications, and <br />plans refers only to trenchless construction. <br />The minimum diameter of the casing pipe shall be four inches (4") greater than the outside <br />diameter of the bell of the carrier pipe. <br />The Contractor shall prevent excavated materials from flowing back into the excavation during <br />the trenchless construction. This shall include the use of a shield conforming to the size and <br />shape of the casing that will prevent materials from flowing into the leading edge of the casing. <br />The machine used shall be capable of controlling line and grade and shall conform to the size <br />and shape of the casing pipe. <br />No jacking/augering of pipe will be allowed below the water table unless the water table has <br />been lowered sufficiently to keep the water below the pipe being installed. The use of water <br />Page 12 <br />