My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and completion of the work as specified, shall be included for payment as part of the pipe and <br />pipe appurtenance items without any direct compensation being made. <br />In the absence of special payment provisions, all costs of restoring surface improvements as <br />required, disposal of surplus or waste materials, maintenance and repair of completed work, <br />and final cleanup operations shall be incidental to the Contract Items under which the costs are <br />incurred. <br />Granular materials furnished for foundation, bedding, cover, or backfill placement as specified in <br />connection with pipe or structure items will only be paid for as separate Contract Items to the <br />extent that the Proposal contains specific Pay Items. Otherwise the furnishing and placing of <br />granular materials as specified shall be incidental to the pipe or structure item without any direct <br />compensation being made. <br />Materials utilized for filling annular spaces due to jacking/boring and drilling fluids for directional <br />boring shall be incidental to the installation of the casing and pipe installed. <br />Contaminated Materials and Regulated Wastes not anticipated in the plans, specifications and <br />special provisions and unexpectedly discovered during construction shall be compensated for <br />as negotiated by supplemental agreement. <br />Contaminated Materials and Regulated Wastes specifically identified for payment in the plans, <br />specifications, and special provisions, will be paid for under separate Contract Items provided in <br />the Proposal. <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.