Laserfiche WebLink
and completion of the work as specified, shall be included for payment as part of the pipe and <br />pipe appurtenance items without any direct compensation being made. <br />In the absence of special payment provisions, all costs of restoring surface improvements as <br />required, disposal of surplus or waste materials, maintenance and repair of completed work, <br />and final cleanup operations shall be incidental to the Contract Items under which the costs are <br />incurred. <br />Granular materials furnished for foundation, bedding, cover, or backfill placement as specified in <br />connection with pipe or structure items will only be paid for as separate Contract Items to the <br />extent that the Proposal contains specific Pay Items. Otherwise the furnishing and placing of <br />granular materials as specified shall be incidental to the pipe or structure item without any direct <br />compensation being made. <br />Materials utilized for filling annular spaces due to jacking/boring and drilling fluids for directional <br />boring shall be incidental to the installation of the casing and pipe installed. <br />Contaminated Materials and Regulated Wastes not anticipated in the plans, specifications and <br />special provisions and unexpectedly discovered during construction shall be compensated for <br />as negotiated by supplemental agreement. <br />Contaminated Materials and Regulated Wastes specifically identified for payment in the plans, <br />specifications, and special provisions, will be paid for under separate Contract Items provided in <br />the Proposal. <br />Page 18 <br />