G Televising <br />Sewer line televising may be required by the Engineer, at the cost of the Contractor, if visual <br />inspection, leakage testing, or deflection testing indicate the sewer has not been constructed in <br />accordance with these specifications and the requirements of the Plans, Specifications, and <br />Special Provisions. <br />2621.4 METHOD OF MEASUREMENT <br />All items will be measured separately according to design designation as indicated in the Pay <br />Item name and as may be detailed and defined in the Plans, Specifications, or Special <br />Provisions. <br />Complete -in -place items shall include all component parts thereof as described or required to <br />complete the unit, but excluding any excesses covered by separate Pay Items. Linear <br />measurement of piping will include the running length of any special fittings (tees, wyes, elbows, <br />gates, etc.) installed within the line of measure between specified terminal points. <br />A Sewer Pipe <br />Sewer pipe of each design designation will be measured by length in linear feet along the line of <br />pipe. Terminal points of measurement will be the pipe end at free outlets; the point of <br />connection with in -place pipe; the center of manholes or catch basins; the point of centerline <br />intersections at branch fittings; or the point of juncture with other appurtenances or units as <br />defined. <br />Separation of quantities according to "depth zone classification", when so designated in the Pay <br />Item, will be determined by depth of pipe invert below the ground surface profile. <br />B Manholes <br />Manholes of each design designation will be measured by number of each constructed <br />complete -in -place, including the base and castings as required, but excluding any excess depth <br />greater than eight feet (8') measured from top of manhole cover to invert elevation of lowest <br />pipe. <br />Excess manhole depth of each design designation will be measured by the linear foot difference <br />in depth between the eight feet (8') allowed as standard and the actual increased depth as <br />constructed. <br />C Catch Basins <br />Catch basins of each design designation will be measured by number of each constructed <br />complete -in -place, including the base and castings as required, but excluding any excess depth <br />greater than five feet (5') measured from top of grate (low point) to invert elevation of lowest <br />outlet pipe. <br />Excess catch basin depth of each design designation will be measured by the linear foot <br />difference in depth between the five feet (5') allowed as standard and the actual increased <br />depth as constructed. <br />Page 54 <br />