My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certified material test results shall be included that confirm that all materials conform to these <br />specifications. Materials not complying with these requirements will be rejected. <br />CIPP Short -Liners or segmental liners shall be of the same materials and meet the structural <br />requirements of the full CIPP Tube liner. <br />A3 Material Testing Requirements <br />1. Chemical Resistance - The CIPP shall meet the chemical resistance requirements of <br />ASTM F1216, Appendix X2. CIPP samples for testing shall be of tube and resin <br />system similar to that proposed for actual construction. It is required that CIPP <br />samples with and without plastic coating meet these chemical testing requirements. <br />2. Hydraulic Capacity - Overall, the hydraulic profile shall be maintained as large as <br />possible. The CIPP shall have a minimum of the full flow capacity of the original pipe <br />before rehabilitation. Calculated capacities may be derived using a commonly <br />accepted roughness coefficient for the existing pipe material taking into consideration <br />its age and condition. <br />3. CIPP Field Samples - When requested by the Owner, the Contractor shall submit <br />test results from field installations in the USA of the same resin system and tube <br />materials as proposed for the actual installation. These test results must verify that <br />the CIPP physical properties specified in above have been achieved in previous field <br />applications. Samples for this project shall be made and tested as described herein. <br />2631.3 CIPPS CONSTRUCTION REQUIREMENTS <br />The Contractor shall clean the interior of the existing host pipe prior to installation of the CIPP <br />liner. All debris and obstructions that will affect the installation and the final CIPP product shall <br />be removed and disposed of. The CIPP liner shall be constructed of materials and methods, <br />that when installed, shall provide a joint less and continuous structurally sound liner able to <br />withstand all imposed static and dynamic loads on a long-term basis. <br />A Installation of CIPPS <br />Al Access <br />It will be the responsibility of the Owner to locate and designate all manhole access points open <br />and accessible for the work, and provide rights of access to these points. If a street must be <br />closed to traffic because of the orientation of the sewer, the Contractor shall institute the actions <br />necessary to do this for the mutually agreed time period. Traffic Control shall be the <br />responsibility of the Contractor and shall conform to the latest revision of the MMUTCD and <br />other provisions of this specification herein. The Contractor shall keep the roadway open to <br />traffic at all times unless given prior approval by the Engineer. <br />A2 Water Usage <br />Water is available from the City at designated locations for cleaning, inversion, and other work <br />items requiring water. Use of an approved double check backflow assembly shall be required. <br />The Contractor shall provide his own approved assembly. The Contractor may use City water <br />Page 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.