My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 06/27/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:33:55 PM
Creation date
7/11/2017 8:03:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1054
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DVD's are to remain property of the Owner; Contractor to retain second copy. <br />• All flows tributary to reach of sewer being inspected are to be completely by-passed <br />around the reach during inspection if necessary and required by the Owner. <br />• Pre -construction video of the existing pipe and post construction video inspection upon <br />completion of reconstruction of each reach of pipe, with the voice description, with <br />stationing of services indicated. Data and stationing to be on video. <br />• Should any portion of the video inspection be of inadequate quality or coverage, as <br />determined by the Owner the Contractor will have the portion re -inspected and video <br />recorded at no additional expense to the Owner. <br />2641.9 METHOD OF MEASUREMENT <br />Measurement for pipe bursting shall be on a linear foot basis, to the nearest whole foot, <br />measured from center of manhole to center of manhole or junction point to junction point as <br />indicated on the plans. <br />2641.10 BASIS OF PAYMENT <br />Pipe Bursting: The work performed as prescribed by this item will be paid for by the linear foot <br />at the unit price bid for the pipe bursting/replacement at the specified pipe diameter and location <br />which price shall be full compensation for the installation of the new pipe, furnishing and placing <br />of all materials, labor, tools, equipment, cleaning, and preparation of the existing pipe to receive <br />the new pipe, tracer wire, pipe bedding, backfill material, annulus sealing material and launching <br />pits, and video inspection of final installed pipe, bypass pumping, temporary water distribution, <br />traffic control, sealing at manholes, locating, excavating, disconnecting, testing in accordance <br />with the Contract Documents, and all else incidental thereto for which separate payment is not <br />provided under other Items in the Bid Form. <br />Page 73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.